โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-Daniel- 156-98-0322H-1

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #42909 ยท Generated 2026-08-22 01:36

API
3310506827
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Closed mud system with no cuttings pit mandated by NDIC Field Order
๐Ÿ“„ Permit Stipulations, Page 2
Regulatory requirement eliminates traditional cuttings pit, forcing use of closed-loop systems and offsite hauling of cuttings.
2026-05-07 Mud / Fluids
Tier 3 Anti-collision Level 1 warning with GO-DANIEL-156-98-0322H-3 (Separation Factor 0.990)
๐Ÿ“„ Scientific Drilling Anti-collision Report
Extremely tight spacing (SF < 1.0) between planned wells on the same pad indicates high-density drilling with elevated risk of wellbore collision. Requires real-time monitoring and precise execution.
2026-04-28 Directional Drilling
Tier 3 BLM notification required for federal minerals within spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Emma Neigum dated April 23, 2026
Spacing unit includes federal minerals requiring coordination with BLM Dickinson office. This adds a regulatory layer beyond state NDIC requirements.
2026-04-23 General Oilfield Services
Tier 3 Waiver request for Order No. 31848 affidavit requirements due to Hess being operator of adjacent units where wellbore traverses
๐Ÿ“„ Letter from Derek Abrahamsen dated March 16, 2026
Hess is drilling back into its own adjacent units (GO-Olson-157-98-2536 and Christopherson 2-30 spacing units), allowing them to bypass regulatory notification requirements to other operators. This indicates strategic unit consolidation and reduced surface footprint complexity.
2026-03-16 Regulatory / Permitting
Tier 3 Production liner cemented with wet shoe designed to 'frac out the shoe'
๐Ÿ“„ Completion Equipment section, Drilling Prognosis
Intentional cement over-displacement and wet shoe design to enable shoe fracturing indicates a specific completion technique to access the first stage directly through the shoe.
Relative Completions / Frac
Tier 3 Waiver requested for open hole logs (Acoustic/Sonic, Density/Porosity, Resistivity)
๐Ÿ“„ Proposed Logs section, Page 4
Hess is opting out of standard open hole logging suite, relying instead on cased hole evaluation and possibly other data sources. Reduces wireline operations but may increase reliance on LWD/MWD.
Relative Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD / Anti-collision Monitoring
Level 1 anti-collision warning between pad wells requires real-time, high-precision surveying and steering. Immediate need for services during drilling of H-1 through H-4 sequence.
Closed-Loop Drilling Fluids & Cuttings Hauling
NDIC mandate for 'closed mud system with no cuttings pit' creates immediate demand for fluid systems, solids control, and hauling to approved disposal facilities upon spud.
Civil Construction & Earthwork
Pad expansion and access road construction detailed in engineering plans (21.73 acres disturbance). Grading, surfacing, and erosion control installation are imminent pre-drilling activities.
Cementing (Primary and Liner)
Specific cement design with wet shoe for 'frac out' and detailed centralizer placement schedule requires precise execution during well construction phase.