๐Ÿ›ข๏ธ GO-Daniel- 156-98-0322H-2

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #42910 ยท Generated 2026-08-22 01:37

API
3310506828
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Permit includes explicit requirement for closed mud system with no cuttings pit, indicating stricter environmental controls than standard.
๐Ÿ“„ Page 2 of 10, STIPULATIONS section
Mandates specific waste management infrastructure from project start, affecting drilling fluid and cuttings handling vendors.
2026-05-07 Mud / Fluids
Tier 3 Anti-collision standards require minimum 1.5 separation factor, with exceptions managed by risk assessments and MOC's.
๐Ÿ“„ Page 7 of 10, PROPOSED WORK
Reveals formalized internal risk management process for tight spacing, beyond regulatory minimums.
2026-05-07 Directional Drilling
Tier 3 BLM notification required for federal minerals within spacing unit, adding a federal layer to permitting.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Emma Neigum dated April 23, 2026
Introduces federal agency oversight (BLM) beyond state NDIC, potentially extending permit timeline.
2026-04-23 General Oilfield Services
Tier 3 Waiver requested for anti-collision notification to adjacent unit operators because Hess operates all affected units.
๐Ÿ“„ Letter from Derek Abrahamsen dated March 16, 2026
Expedites regulatory approval by eliminating need to coordinate with external operators, revealing Hess's consolidated control in the area.
2026-03-16 Directional Drilling
Tier 3 Use of a 'wet shoe' sub with rupture pins for liner cementing to intentionally frac out the shoe.
๐Ÿ“„ Completion Equipment section
Non-standard completion technique designed for positive shoe communication, indicating tailored frac design.
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location construction, indicating pre-approval inspection requirement.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, Construction Commencement Notification
Adds a regulatory checkpoint before pad construction can begin, potentially delaying earthwork and pad build.
Relative General Oilfield Services
Tier 3 Specific cement centralizer placement strategy detailed for production casing, indicating heightened zonal isolation concerns.
๐Ÿ“„ Drilling Prognosis, Production Casing Centralizer Placement
Explicit, non-standard centralizer spacing (every joint vs. typical every other) through salt zones and key formations.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Detailed engineered pad plans (21.73 acres) with specific compaction, stabilization, and erosion control requirements; construction must wait for NDIC inspector notification.
Cementing & Centralizer Services
Non-standard centralizer schedule and specialized cement designs (silica, extenders) required for production casing and liner; critical for well integrity.
Directional Drilling & MWD/LWD
Anti-collision planning with 1.5 separation factor and real-time survey requirements; high-density pad demands precise wellbore placement.
Waste Management & Hauling
Closed mud system mandate and cuttings hauling to approved facility; no onsite pit creates continuous offsite hauling need.
Completions & Stimulation
Halliburton pre-selected for frac; wet shoe design and plug-and-perf method specified; operations contingent on prior BLM and NDIC approvals.