Production liner cemented with wet shoe for frac-out capability ๐ STIPULATIONS - Conditions of Approval West boundary setback reduced to 150' based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. Non-standard completion design choice. |
2026-05-07 | Completions / Frac |
| Tier 3 |
Open hole log waiver approved based on offset well data ๐ WELL SUNDRY FORM - DESCRIPTION (OPERATOR) Operator successfully avoided standard open hole logging requirement by demonstrating offset well (Burke 18-27H) within one mile provides sufficient formation data. This reduces evaluation costs and time. |
2026-05-08 | Regulatory / Permitting |
| Tier 3 |
Closed mud system with no cuttings pit required ๐ STIPULATIONS - Permit Review Policy Non-standard environmental stipulation mandates closed-loop drilling fluid system, eliminating traditional cuttings pit. |
2026-05-07 | Mud / Fluids |
| Tier 3 |
Federal mineral coordination required with BLMโฐ TIME-SENSITIVE ๐ Email from Doug Jackson (NDIC) to Jennifer Yu NDIC flagged that spacing unit may be subject to Federal permit, requiring operator to contact BLM Dickinson office. Adds regulatory layer. |
2026-05-06 | General Oilfield Services |
| Tier 3 |
Mandatory contact with specific NDIC Field Inspector prior to location constructionโฐ TIME-SENSITIVE ๐ STIPULATIONS - Construction Commencement Notification EOG must contact NDIC Field Inspector Dylan Roach (701-770-1981) personally before starting pad construction. This creates a specific regulatory checkpoint. |