โ† Back to Daily Permits

๐Ÿ›ข๏ธ SPACKLER 1 SWD

Phoenix Operating LLC ยท Divide County, ND ยท File #42915 ยท Generated 2026-05-12 02:13

API
3302301800
Target Formation
Dakota Group
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit expires if well not completed as Saltwater Disposal by May 8, 2027.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 5/8/2026
Strict deadline for completion, indicating urgency in drilling and completion operations.
2027-05-08 General Oilfield Services
Tier 3 Tank diking variance approved contingent on submission of as-built site schematic after facility construction completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 5/8/2026
Variance allows non-standard tank diking dimensions, but requires post-construction documentation, potentially delaying operations and increasing regulatory scrutiny.
2026-05-08 General Oilfield Services
Tier 3 Injection zone specified as Inyan Kara Formation within Dakota Group, with no plans to accept third-party injection volumes.
๐Ÿ“„ Page 5 of 10, Date: 5/8/2026; Appendix D
Targets a specific sub-formation not typically detailed in basic permits, and explicitly limits to on-pad wells, indicating self-contained disposal strategy.
2026-05-08 General Oilfield Services
Tier 3 Approach permit submitted and awaiting approval, with road share agreement effective for two years including maintenance responsibilities.โฐ TIME-SENSITIVE
๐Ÿ“„ Appendix F, Approach Permit & Traffic Flow Diagram; Road Share Agreement dated 3/19/2026
Access road construction is pending regulatory approval, with shared maintenance obligations, potentially impacting project timelines.
2026-03-19 General Oilfield Services
Tier 3 SCADA system with remote monitoring, including tank level alarms, separator alarms, and automatic shutdown valves for spill prevention.
๐Ÿ“„ Appendix F, Spill Prevention and Monitoring Controls
Advanced automation beyond basic permit requirements, suggesting high environmental risk mitigation and potential for integrated digital services.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental monitoring and compliance
SPCC Plan must be implemented within 6 months of commissioning; freshwater sampling and lab analysis already completed in February 2026, indicating ongoing need for monitoring services.
Infrastructure construction
Approach permit awaiting approval; road design completed December 2025, with construction pending, creating immediate opportunities for road building and surveying.
Drilling and completion
Permit expires May 8, 2027; directional drilling with oil-based mud and specific completion program require timely specialized services.