| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Cemented liner with wet shoe design for frac-out capability, specifically to meet east setback requirement ๐ Stipulations, Page 2; Completion Equipment Non-standard completion design (wet shoe with rupture pins) to address regulatory setback; indicates engineered solution for proximity to section line. |
Unknown | Completions / Frac |
| Tier 3 |
Off-spacing affidavit required due to wellbore entering adjacent spacing unit owned by Devon Energy Williston, LLCโฐ TIME-SENSITIVE ๐ Drilling Permit Affidavit Regulatory requirement for off-spacing wells; indicates pre-drilling coordination with competitor operator (Devon) and potential for surface/access agreements. |
2026-02-03 | General Oilfield Services |
| Tier 3 |
Anti-collision plan reveals planned proximity (<1.5 separation factor) to multiple existing wellbores, requiring active geo-steering ๐ Anti-collision Report; Proposed Work High-density drilling area with close approaches (some <0.1 separation factor); indicates complex directional drilling with real-time anti-collision monitoring. |
2026-01-21 | Directional Drilling |
| Tier 3 |
Core and sample submission deadlines: cuttings within 30 days, cores within 180 days of drilling completionโฐ TIME-SENSITIVE ๐ Cores and Samples Letter Regulatory deadlines with penalties ($12,500/day); indicates planned coring or extensive sample collection. |
Relative | General Oilfield Services |
| Tier 3 |
Specific requirement to contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations, Page 2 Named inspector with direct phone contact; indicates heightened regulatory oversight or site-specific conditions requiring pre-construction inspection. |
Relative | General Oilfield Services |