๐Ÿ›ข๏ธ RS-Jones- 156-92-3532H-3

Hess Bakken Investments II, LLC ยท Mountrail County, ND ยท File #42917 ยท Generated 2026-08-22 01:40

API
3306105690
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Conditional permit approval requiring east setback based on cemented production liner with wet shoe and ability to 'frac out the shoe'.
๐Ÿ“„ Permit Information - Stipulations section
Specific engineering requirement for completion design (wet shoe sub with rupture pins) that dictates frac operations and equipment selection.
2026-05-08 Completions / Frac
Tier 3 Mandatory core and sample submission to ND Geological Survey within strict deadlines (30 days for cuttings, 180 days for cores) with explicit civil penalty warning of $12,500 per day violation.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from ND Mineral Resources dated 5/12/2026
Regulatory enforcement with severe financial penalties for non-compliance creates urgent post-drilling service window for sample handling, packaging, and logistics.
2026-05-12 General Oilfield Services
Tier 3 Affidavit provided to adjacent operator (Devon Energy Williston, LLC) for entering Bakken Petroleum System outside target spacing unit, with directional plans delivered via FedEx and email on February 3, 2026.
๐Ÿ“„ Drilling Permit Affidavit
Formal legal notification to competitor with documented delivery, indicating potential unit boundary issues or coordinated development.
2026-02-03 Directional Drilling
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspector (Dylan Roach at 701-770-1981) prior to location construction.
๐Ÿ“„ Permit Information - Stipulations section
Personalized regulatory oversight requiring direct coordination with named inspector, indicating heightened scrutiny or specific site concerns.
Relative General Oilfield Services
Tier 3 Anti-collision standards require minimum 1.5 separation factor with exceptions managed by risk assessments and Management of Change (MOC) processes.
๐Ÿ“„ Proposed Work - Anti-Collision Statement
Reveals formalized risk management protocol (MOC) for anti-collision exceptions, indicating systematic approach to wellbore proximity issues.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Sample/Core Handling & Logistics
Mandatory 30-day deadline for sample submission and 180-day deadline for cores post-drilling creates urgent service window for specialized packaging, drying, and shipping to state library.
Directional Drilling & Surveying
Anti-collision requirements in dense field (multiple offset wells identified) necessitate real-time survey corrections, geo-steering, and potential trajectory adjustments during drilling.
Civil Construction & Erosion Control
Detailed engineered pad design with specific material specifications (impermeable dikes, cement stabilization, erosion control blankets) requires specialized contractors familiar with KLJ Engineering plans.
Completion Equipment & Services
Wet shoe sub requirement and swell packer installation for zone isolation create specific equipment needs that must be coordinated with Halliburton's frac operations.