๐Ÿ›ข๏ธ RS-Jones- 156-92-3532H-4

Hess Bakken Investments II, LLC ยท Mountrail County, ND ยท File #42918 ยท Generated 2026-08-22 01:40

API
3306105691
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on a 500' north/south and 150' east/west setback within a 2560-acre spacing unit, with east setback based on a cemented production liner with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, Page 2 of 10
Specific, non-standard setback condition tied to a precise completion design (cemented liner with wet shoe). Deviations require regulatory re-approval.
2026-05-08 Completions / Frac
Tier 3 Mandatory core and sample submission to ND Geological Survey with strict deadlines (30 days for cuttings, 180 days for cores) and high penalty risk ($12,500 per day violation).โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Ross Edison, Geologist, dated 5/12/2026
Regulatory requirement with severe financial penalties for non-compliance; creates a post-drilling logistics and documentation deadline.
2026-05-12 General Oilfield Services
Tier 3 Operator asserts use of real-time corrected surveys, anti-collision standards with 1.5 separation factor, and active geo-steering with Gamma ray to avoid existing wellbores.
๐Ÿ“„ Proposed Work / Anti-Collision Statement, Page 7 of 10
Reveals a formal, documented anti-collision protocol exceeding basic requirements, indicating a dense drilling environment and operational risk mitigation.
2026-05-08 Directional Drilling
Tier 3 Affidavit confirms notification and plan sharing with Devon Energy Williston, LLC (adjacent unit operator) via FedEx and email on February 3, 2026, for off-spacing entry.
๐Ÿ“„ Drilling Permit Affidavit by Derek Abrahamsen
Demonstrates proactive, documented regulatory compliance and inter-operator communication for a complex, multi-unit well path.
2026-02-03 General Oilfield Services
Tier 3 Detailed, engineered pad design by KLJ Engineering includes specific quantities for excavation, embankment, surfacing, and interim reclamation, with a proposed disturbance of 14.19 acres.
๐Ÿ“„ Engineered Well Pad design sheets (multiple pages)
Extensive, pre-designed civil construction plan with quantified materials. Shows high level of pre-investment and planning for a multi-well pad.
2026-01-28 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to location construction.
๐Ÿ“„ Stipulations section, Page 2 of 10
Personalized, named inspector contact is a pre-construction gate. Indicates heightened regulatory oversight or site-specific sensitivities.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthmoving
Detailed pad design with 36,108 CY of excavation/embankment and 14.19-acre disturbance is approved. Construction must commence after contacting NDIC Inspector Dylan Roach, creating an immediate mobilization opportunity.
Directional Drilling / MWD / LWD / Geo-steering
Anti-collision protocol mandates real-time surveys, 1.5 separation factor, and active geo-steering. Drilling of this well (H-4) is imminent within a dense pad, requiring high-precision services to avoid collisions with other planned and existing wells.
Cementing & Liner Services
The approved well design is contingent on running and cementing a 4-1/2" production liner with a wet shoe sub. This is a non-negotiable part of the completion sequence to meet regulatory setbacks.
Logistics & Sample Management
Regulatory letter sets a 30-day deadline post-drilling for sample submission and 180 days for cores. Service is needed to collect, wash, dry, package, and ship cuttings/cores to the state library to avoid penalties.