| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Use of a 'wet shoe' sub with rupture pins and plug chamber on the production liner, intentionally over-displacing cement by 2 bbls, with first stage pumped out the shoe. ๐ Drilling Prognosis - Completion Equipment Specific, non-standard liner cementing technique. The wet shoe design and intentional over-displacement indicate a planned method to ensure shoe integrity for subsequent frac operations ('ability to frac out the shoe'), which is a regulatory condition of approval. |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore enters adjacent spacing unit operated by Devon Energy Williston, LLC, requiring formal notification and anti-collision planning. ๐ Drilling Permit Affidavit, Anti-collision Report Indicates a non-standard well path crossing into another operator's unit, requiring coordination, legal notification, and heightened anti-collision measures. This creates a specific, time-sensitive interface with a competitor. |
2026-02-03 | Directional Drilling |
| Tier 3 |
Waiver requested for open hole logs (Acoustic/Sonic, Density/Porosity, etc.), indicating a reliance on cased hole evaluation and potentially reducing open-hole logging scope. ๐ Geologic Information - Proposed Logs Shows operator intent to skip certain open-hole logs, which is a non-routine design choice that must be approved via a separate sundry notice. This changes the traditional wireline/logging program. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Closed mud system with no cuttings pit mandated. Cuttings will be hauled to a state-approved facility. ๐ Permit Information - Stipulations, Drilling Prognosis Eliminates a routine on-site disposal option (cuttings pit). Requires pre-arranged hauling and off-site disposal services, impacting logistics and cost structure. |
Unknown | Mud / Fluids |
| Tier 3 |
Explicit requirement to contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Information - Stipulations Identifies a specific, named regulator who must be engaged before pad work begins. This is a gate for construction timing and indicates a pre-construction inspection or notification step. |
Relative | General Oilfield Services |
| Tier 3 |
Specific, non-standard cement centralizer placement program for 7" production casing, with varying frequency based on geological zones (e.g., every joint near salts, every other joint elsewhere). ๐ Drilling Prognosis - Casing and Cement Program Exceeds routine centralizer specs. Indicates a tailored, geologically-aware cementing strategy focused on salt zones and the build section, implying past issues or specific isolation concerns. |
Unknown | General Oilfield Services |