๐Ÿ›ข๏ธ LINDVIG 23-22-21-20F 1H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42921 ยท Generated 2026-08-22 01:44

API
3305310801
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 West setback reduced to 150' based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, first page
Non-standard setback exception indicates engineered completion design with cemented liner and planned frac-out capability, allowing tighter spacing to boundary
Unknown Completions / Frac
Tier 3 Operator notified BLM that permit applications are within spacing unit subject to Federal permit, requiring contact with BLM Dickinson officeโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated 5/11/2026
Federal mineral involvement adds layer of regulatory approval beyond state; BLM coordination required before drilling
2026-05-11 General Oilfield Services
Tier 3 Operator filed affidavit notifying Oasis Petroleum (Chord Energy) of wells entering Bakken system outside target spacing unit per NDIC Order 31848
๐Ÿ“„ Affidavit sworn 3/24/2026
Demonstrates proactive regulatory compliance with adjacent unit notification requirements; reveals multi-well pad development crossing unit boundaries
2026-03-24 General Oilfield Services
Tier 3 Wet shoe design with ability to frac out toe, plus hydraulic toe sleeve backup in case wet shoe fails
๐Ÿ“„ Completion details and schematic notes
Redundant completion design with primary and backup toe initiation methods indicates focus on ensuring lateral access
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit; cuttings hauled to Secure Energy Services at specific Williston address
๐Ÿ“„ Stipulations and disposal sections
Explicit waste disposal vendor named (Secure Energy Services); closed-loop system mandated
Unknown Mud / Fluids
Tier 3 Mandatory contact with NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, first page
Specific inspector named with direct contact requirement indicates heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Waste Disposal & Environmental Services
Secure Energy Services explicitly named as cuttings disposal vendor; closed-loop system required; opportunity for competitors on future pads
Completion Tools & Services
Wet shoe with frac-out capability and hydraulic toe sleeve backup indicates need for specialized completion equipment; cemented liner design requires precise execution
Regulatory Coordination & Inspection
Mandatory pre-construction contact with specific NDIC inspector; BLM coordination required; multi-operator notifications create timing dependencies
Civil Construction & Pad Building
Detailed pad design with specific erosion control, berm, and containment requirements; 57,050 CY earthwork volume indicates significant construction scope