| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
West setback exception based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Stipulations section, first page Non-standard setback approval indicates engineered solution for boundary proximity; requires specific completion technique |
Unknown | Completions / Frac |
| Tier 3 |
Permit may be subject to Federal BLM permit due to spacing unit compositionโฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 5/11/2026 Additional federal regulatory layer could delay operations; requires contact with BLM Dickinson office |
2026-05-11 | General Oilfield Services |
| Tier 3 |
Wellbore enters adjacent spacing unit requiring notification to competitor Oasis Petroleum (Chord Energy) per NDIC Order 31848โฐ TIME-SENSITIVE ๐ Affidavit section at end of document Regulatory requirement to share directional drilling and completion plans with adjacent operator creates competitive intelligence exposure and coordination requirements |
2026-03-24 | Directional Drilling |
| Tier 3 |
First perforation point approximately 100' from hard line and 250' from section line ๐ Casing details diagram notes Precise geometric positioning of first perf indicates engineered approach to boundary constraints |
Unknown | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit; cuttings hauled to Secure Energy Services facility ๐ Stipulations and Disposal of Drill Cuttings sections Pre-selected waste disposal vendor and specific disposal method mandated |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section, first page Personalized regulatory oversight indicates heightened scrutiny or site-specific concerns |
Relative | General Oilfield Services |