โ† Back to Daily Permits

๐Ÿ›ข๏ธ LINDVIG 23-22-21-20F 4H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42924 ยท Generated 2026-08-22 01:45

API
3305310804
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 1 West setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, page 1
Regulatory variance allowing closer proximity to west boundary due to specific completion design (wet shoe with frac-out capability), indicating engineered solution to spacing constraints
Unknown Completions / Frac
Tier 3 Federal minerals coordination required with BLM Dickinson office for spacing unit
๐Ÿ“„ Email from Nathaniel Erbele dated 5/11/2026
Permit flagged for federal mineral overlap, requiring additional BLM documentation and coordination
2026-05-11 General Oilfield Services
Tier 3 Adjacent unit notification affidavit filed with Oasis Petroleum (Chord Energy) for off-unit drilling
๐Ÿ“„ Affidavit sworn 3/24/2026
Formal regulatory compliance action notifying competitor of wellbores entering their spacing unit, with directional plans shared
2026-03-24 Directional Drilling
Tier 3 Drill cuttings disposal pre-selected to Secure Energy Services at specific Williston address
๐Ÿ“„ Disposal of Drill Cuttings section
Vendor and disposal facility explicitly named in permit, indicating locked-in waste management contract
Unknown General Oilfield Services
Tier 3 Mandatory contact with NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Specific inspector named with direct contact requirement, indicating heightened regulatory oversight or site-specific conditions requiring pre-construction approval
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Specialized cementing services
West setback exception hinges on production liner cemented in lateral with wet shoe design; requires precise execution to meet regulatory condition
Regulatory coordination and permitting
Mandatory contact with specific field inspector before construction; federal minerals coordination required with BLM; adjacent unit notifications already filed
Drilling waste management
Closed mud system with cuttings disposal pre-awarded to Secure Energy Services; opportunity locked unless contract changes
Pad construction and earthwork
Detailed engineering plans with specific compaction requirements (95-100% proctor); impermeable liner required at inspector discretion; timing dependent on inspector contact