| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit expires if well not completed by May 11, 2027โฐ TIME-SENSITIVE ๐ Page 3 of 10, Date: 5/11/2026 Creates urgency for completion to avoid permit lapse, unlike standard permits |
2027-05-11 | General Oilfield Services |
| Tier 3 |
Tank dike variance approved contingent on as-built schematic submission ๐ Page 3 of 10, Date: 5/11/2026 Non-standard containment design requiring post-construction documentation |
2026-05-11 | General Oilfield Services |
| Tier 3 |
Approach permit submitted and road share agreement signed ๐ Appendix F Shared road maintenance obligations with township |
2026-03-19 | General Oilfield Services |
| Tier 3 |
Notices mailed to landowners within 1/4 mile on March 16, 2026โฐ TIME-SENSITIVE ๐ Appendix E, Affidavit of Mailing 30-day notification prior to hearing, with delivery confirmations |
2026-03-16 | General Oilfield Services |
| Tier 3 |
Freshwater samples collected from three wells within 1-mile on February 4, 2026 ๐ Appendix B, Affidavit of Freshwater Wells Proactive baseline water quality testing for injection permit |
2026-02-04 | General Oilfield Services |
| Tier 3 |
No existing wellbores within Area of Review ๐ Appendix B Clean AOR allows for unrestricted injection design |
Unknown | Directional Drilling |
| Tier 3 |
SCADA system with remote monitoring and alarms for tanks and separators ๐ Page 8 of Facility Design section Advanced automation beyond basic regulatory requirements |
Unknown | General Oilfield Services |
| Tier 3 |
Facility co-located with planned oil wells on same pad ๐ Appendix F, Approach Permit & Traffic Flow Diagram Integrated pad design for multiple wells, not isolated SWD |
Unknown | General Oilfield Services |
| Tier 3 |
Multiple wells permitted on same pad, including SWD ๐ Appendix B, Well List Pad development for 5 laterals plus SWD, not single well |
Unknown | General Oilfield Services |