โ† Back to Daily Permits

๐Ÿ›ข๏ธ CADDYSHACK 1 SWD

Phoenix Operating LLC ยท Divide County, ND ยท File #42926 ยท Generated 2026-05-13 02:24

API
3302301802
Target Formation
Dakota Group
Confidence
High

๐Ÿ“Š Signals (9)

Tier Signal Date Service Impact
Tier 3 Permit expires if well not completed by May 11, 2027โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 5/11/2026
Creates urgency for completion to avoid permit lapse, unlike standard permits
2027-05-11 General Oilfield Services
Tier 3 Tank dike variance approved contingent on as-built schematic submission
๐Ÿ“„ Page 3 of 10, Date: 5/11/2026
Non-standard containment design requiring post-construction documentation
2026-05-11 General Oilfield Services
Tier 3 Approach permit submitted and road share agreement signed
๐Ÿ“„ Appendix F
Shared road maintenance obligations with township
2026-03-19 General Oilfield Services
Tier 3 Notices mailed to landowners within 1/4 mile on March 16, 2026โฐ TIME-SENSITIVE
๐Ÿ“„ Appendix E, Affidavit of Mailing
30-day notification prior to hearing, with delivery confirmations
2026-03-16 General Oilfield Services
Tier 3 Freshwater samples collected from three wells within 1-mile on February 4, 2026
๐Ÿ“„ Appendix B, Affidavit of Freshwater Wells
Proactive baseline water quality testing for injection permit
2026-02-04 General Oilfield Services
Tier 3 No existing wellbores within Area of Review
๐Ÿ“„ Appendix B
Clean AOR allows for unrestricted injection design
Unknown Directional Drilling
Tier 3 SCADA system with remote monitoring and alarms for tanks and separators
๐Ÿ“„ Page 8 of Facility Design section
Advanced automation beyond basic regulatory requirements
Unknown General Oilfield Services
Tier 3 Facility co-located with planned oil wells on same pad
๐Ÿ“„ Appendix F, Approach Permit & Traffic Flow Diagram
Integrated pad design for multiple wells, not isolated SWD
Unknown General Oilfield Services
Tier 3 Multiple wells permitted on same pad, including SWD
๐Ÿ“„ Appendix B, Well List
Pad development for 5 laterals plus SWD, not single well
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services
Permit expires May 2027; directional drilling planned with anti-collision modeling
Environmental and lab services
Water samples collected Feb 2026; lab reports completed Feb 2026; indicates pre-spud readiness
Surveying and engineering
Plat revised March 2026; road design updated; as-built schematic required post-construction
Waste disposal
Smoky Butte designated for cuttings; closed-loop system planned
Monitoring and automation
SCADA installation imminent; SPCC plan due within 6 months of commissioning