๐Ÿ›ข๏ธ TUNNOCK 5303 12-2 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42927 ยท Generated 2026-08-22 01:46

API
3310506830
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration detailed: 400 ft uncemented annulus at liner toe, over-displaced by 7 bbls to enable wireline pump-down of first stage guns.
๐Ÿ“„ Wet Shoe section, Wellbore Schematics
Specific, non-standard cementing/completion design to enable cost-effective toe initiation, directly linked to permit condition.
Unknown Completions / Frac
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, Page 1
Specific, non-standard setback conditions tied to a unique wellbore construction (wet shoe) and completion technique, indicating regulatory negotiation and tailored design.
Unknown Completions / Frac
Tier 3 Drill-back notification affidavit certifying email to Devon Energy on 2/11/2026 regarding wellbores entering Bakken outside target spacing unit.
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Formal, notarized compliance with drill-back policy, revealing interaction with specific competitor (Devon) and advanced regulatory diligence.
2026-02-11 General Oilfield Services
Tier 3 Anticipated commencement date: Jul 15, 2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates, Section 1.8
Explicit start date provided in planning documents, indicating firm operational timeline.
2025-07-15 General Oilfield Services
Tier 3 CBL required on 9-5/8" intermediate (Dakota water string) prior to setting 7" casing, plus standard CBL on 7" casing.
๐Ÿ“„ Page 2
Extra cement bond log requirement on intermediate string beyond standard practice, indicating heightened regulatory scrutiny on aquifer protection.
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification, Page 1
Explicit, named inspector pre-approval requirement for pad construction, not just spudding.
Relative General Oilfield Services
Tier 3 Waiver requested for proposed logs (Acoustic, Cased Hole, etc.) via separate sundry notice.
๐Ÿ“„ Geologic Information / Proposed Logs, Page 3-4
Operator intends to forego standard open-hole logging suite, requiring regulatory approval.
Unknown Regulatory / Permitting
Tier 3 Perimeter berm required, closed mud system with no cuttings pit, remote/automatic shutoff devices required on all equipment.
๐Ÿ“„ Permit Review Policy, Page 1
Bundled, stringent environmental and safety controls mandated as permit conditions.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing & Downhole Tools
Wet shoe design requires precise cement over-displacement and specific shoe/joint equipment; regulatory conditional approval is tied to this design.
Wireline & Perforating
First-stage perforations planned via wireline pump-down enabled by wet shoe; timing aligns with completion after drilling (~30 days post spud).
Pad Construction & Earthwork
Mandatory pre-construction inspection by named NDIC inspector; perimeter berm, closed mud system, and detailed cut/fill specs require specialized contractors.
Drilling Fluids & Waste Management
Closed mud system with no cuttings pit mandated; dry cuttings must go to licensed disposal facility from pre-approved list.
Directional Drilling & Surveying
Complex anti-collision environment with many offset wells; operator uses real-time corrected surveys and gamma ray for collision avoidance.