๐Ÿ›ข๏ธ TUNNOCK 5303 12-2 4B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42928 ยท Generated 2026-08-22 01:47

API
3310506831
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within a 2560-acre spacing unit, with south setback based on a production liner cemented in lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, page 1
Specific, non-standard setback conditions tied to a unique wellbore construction (wet shoe) and completion technique. This imposes a hard geometric constraint on the lateral placement and indicates a tailored regulatory approval.
Unknown Completions / Frac
Tier 2 Detailed 'Wet Shoe' configuration described: intentionally over-displacing cement by 7 bbls to create ~400 ft uncemented annulus at liner toe for wireline pump-down perforating.
๐Ÿ“„ Wet Shoe section, attachment
Detailed engineering design for a specific completion technique aimed at cost-saving (avoiding tubing/tractor perforating). It's a deliberate, non-standard cementing and completion plan.
Unknown Completions / Frac
Tier 3 Drill-back notification affidavit certifies email notification was sent to adjacent operator (Devon Energy) on 2/11/2026 regarding wellbores entering Bakken outside target unit.
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Documents formal, dated communication with a specific competitor (Devon) regarding subsurface encroachment, demonstrating proactive regulatory compliance and inter-operator coordination.
2026-02-11 General Oilfield Services
Tier 3 Anticipated Commencement Date: Jul 15, 2025. Drilling Days: Approximately 30 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates, attachment section
Explicit target start date and duration provided in the planning documents, indicating firm operator scheduling intent.
2025-07-15 Mud / Fluids
Tier 3 A CBL is required on the 9-5/8" intermediate (Dakota water string) prior to setting 7" casing. A standard CBL is required on the 7" casing.
๐Ÿ“„ Page 2
Mandates two specific cement bond logs at defined casing points. The requirement on the intermediate string prior to proceeding is an extra verification step.
Relative General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification, page 1
Explicit, named inspector pre-notification requirement is a specific procedural hurdle beyond standard permit approval.
Relative Drilling Rigs
Tier 3 Operator asserts they will give 21-31 days prior written notice to operators of wells in same/adjacent pool if completion intervals are within 2,640 feet.โฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions, page 7
Goes beyond standard NDIC rules, indicating operator's internal policy or response to local coordination needs, creating a formal notification window.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing & Wireline Services
The approved 'wet shoe' design requires precise cement over-displacement and will be followed by wireline pump-down perforating for the toe stage, creating immediate service opportunities tied to this specific completion sequence.
Drilling & Directional Services
Firm anticipated spud date of ~Jul 15, 2025, with a 30-day drilling program. Anti-collision report shows complex well paths near existing wells, demanding high-precision directional drilling services.
Solid Waste/Drill Cuttings Hauling & Disposal
Operator has pre-selected a list of 9 licensed disposal facilities. Haulers and disposal sites on this list (e.g., Chimney Butte, Dishon Disposal, Secure Energy, Tervita) have a defined opportunity for this well's cuttings.
Regulatory & Inspection Coordination
Mandatory pre-construction contact with named NDIC Inspector Jessica Gilkey and required CBLs at specific casing points create defined touchpoints for inspection and compliance services.