| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within a 2560-acre spacing unit, with south setback based on a production liner cemented in lateral with a wet shoe and ability to frac out the shoe. ๐ Stipulations section, page 1 Specific, non-standard setback conditions tied to a unique wellbore construction (wet shoe) and completion technique. This imposes a hard geometric constraint on the lateral placement and indicates a tailored regulatory approval. |
Unknown | Completions / Frac |
| Tier 2 |
Detailed 'Wet Shoe' configuration described: intentionally over-displacing cement by 7 bbls to create ~400 ft uncemented annulus at liner toe for wireline pump-down perforating. ๐ Wet Shoe section, attachment Detailed engineering design for a specific completion technique aimed at cost-saving (avoiding tubing/tractor perforating). It's a deliberate, non-standard cementing and completion plan. |
Unknown | Completions / Frac |
| Tier 3 |
Drill-back notification affidavit certifies email notification was sent to adjacent operator (Devon Energy) on 2/11/2026 regarding wellbores entering Bakken outside target unit. ๐ Affidavit Affirming Drill-Back Notification Documents formal, dated communication with a specific competitor (Devon) regarding subsurface encroachment, demonstrating proactive regulatory compliance and inter-operator coordination. |
2026-02-11 | General Oilfield Services |
| Tier 3 |
Anticipated Commencement Date: Jul 15, 2025. Drilling Days: Approximately 30 days.โฐ TIME-SENSITIVE ๐ Anticipated Starting Dates, attachment section Explicit target start date and duration provided in the planning documents, indicating firm operator scheduling intent. |
2025-07-15 | Mud / Fluids |
| Tier 3 |
A CBL is required on the 9-5/8" intermediate (Dakota water string) prior to setting 7" casing. A standard CBL is required on the 7" casing. ๐ Page 2 Mandates two specific cement bond logs at defined casing points. The requirement on the intermediate string prior to proceeding is an extra verification step. |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE ๐ Construction Commencement Notification, page 1 Explicit, named inspector pre-notification requirement is a specific procedural hurdle beyond standard permit approval. |
Relative | Drilling Rigs |
| Tier 3 |
Operator asserts they will give 21-31 days prior written notice to operators of wells in same/adjacent pool if completion intervals are within 2,640 feet.โฐ TIME-SENSITIVE ๐ Operator Assertions, page 7 Goes beyond standard NDIC rules, indicating operator's internal policy or response to local coordination needs, creating a formal notification window. |
Relative | Completions / Frac |