๐Ÿ›ข๏ธ TUNNOCK 5303 12-2 5B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42929 ยท Generated 2026-08-22 01:48

API
3310506832
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, page 1
Specific setback conditions tied to completion design (wet shoe) indicate regulatory accommodation for planned frac operations; competitors should note spacing unit boundaries and completion constraints.
Unknown Completions / Frac
Tier 2 Wet shoe configuration detailed: 400' uncemented annulus at liner toe, over-displaced by 7 bbls to enable wireline pump-down perforating for toe initiation
๐Ÿ“„ Wet Shoe section, page 8
Non-standard cement design to facilitate cost-effective toe initiation (avoiding tubing/tractor) reveals operator completion efficiency intent.
Unknown Completions / Frac
Tier 3 Drill-back notification affidavit shows email sent to Devon Energy on 2/11/2026 regarding wellbores entering adjacent spacing unit
๐Ÿ“„ Affidavit Affirming Drill-Back Notification, page 10
Formal drill-back notice to a major competitor (Devon) demonstrates proactive regulatory compliance and reveals lateral extent into adjacent unit.
2026-02-11 General Oilfield Services
Tier 3 Anticipated commencement date: July 15, 2025; drilling days: approximately 30โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates, page 6
Specific start date and duration provided in planning documents, indicating firm operational timeline.
2025-07-15 Drilling Rigs
Tier 3 CBL required on 9-5/8" intermediate (Dakota water string) prior to setting 7" casing, plus standard CBL on 7" casing
๐Ÿ“„ Page 2
Extra cement bond log requirement on intermediate string beyond routine indicates regulatory concern over Dakota aquifer protection or casing integrity.
Unknown General Oilfield Services
Tier 3 Operator acknowledges providing 21-31 days prior written notice to operators of wells in same/adjacent pool within 2640' of completion interval
๐Ÿ“„ Operator Assertions, page 7
Formalized long-lead notification to competitors (like Devon Energy) reveals planned frac interference management and potential for coordinated completions.
Relative Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Jessica Gilkey prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification, page 1
Pre-construction contact with a named inspector (Jessica Gilkey) is mandated, indicating heightened regulatory oversight or site-specific conditions.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad Construction & Earthwork
Construction must begin after permit publication (3 business day wait) and requires prior contact with NDIC Inspector Jessica Gilkey. Earthwork quantities detailed: ~8,100 CY topsoil stripping, ~62,900 CY excavation, ~70,600 CY embankment. Timing tied to July 15, 2025 spud.
Cementing & Logging
Non-routine CBL requirements on 9-5/8" and 7" casing strings create additional logging runs. Wet shoe cement design demands precise over-displacement (7 bbls) and 400' uncemented annulus. Cement top job required if fallback >10' below ground.
Directional Drilling & Surveying
Anti-collision measures mandate real-time survey correction, 1.2 separation factor, and increased survey frequency near crossings. Survey program uses OWSG MWD + IFR1 + Multi-Station Correction tool. Close approaches to multiple existing wells (e.g., JAFFA, TUNNOCK siblings) require careful planning.
Stimulation & Completion
Wet shoe design enables wireline pump-down perforating for toe initiation. Operator must notify adjacent operators (Devon) 21-31 days before completion. No diesel-based stimulation fluids will be used. Frac design will be based on post-completion production rates.
Waste Management & Disposal
Closed mud system with no cuttings pit required. Drill cuttings must go to licensed disposal facilities (list provided). Filter sock leak-proof container must be on site from spud through flowback. Solid waste transporters need DEQ permits.