๐Ÿ›ข๏ธ JAFFA 5303 12-2 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42930 ยท Generated 2026-08-22 01:49

API
3310506833
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, page 1
Specific geomechanical condition tied to completion design (wet shoe) for regulatory approval, indicating a tailored engineering solution to meet spacing requirements.
Unknown Completions / Frac
Tier 2 Wet shoe configuration detailed: 400 ft of uncemented annulus at liner toe, over-displaced by 7 bbls to enable wireline pump-down perforating for toe initiation.
๐Ÿ“„ Section 1.11 Wet Shoe and schematic
Non-standard liner cementing design to facilitate cost-effective toe initiation, revealing a specific completion methodology choice.
Unknown Completions / Frac
Tier 3 Drill-back notification provided to adjacent operator (Devon Energy) via email on February 11, 2026, as required for off-spacing unit drilling.
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Demonstrates regulatory compliance and inter-operator coordination for a wellbore traversing adjacent units, mitigating conflict risk.
2026-02-11 General Oilfield Services
Tier 3 Affidavit affirming surface use agreement with landowner for off-lease drilling, executed February 10, 2026.
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
Legal document confirms surface access secured for pad location outside target spacing unit, a prerequisite for drilling.
2026-02-10 General Oilfield Services
Tier 3 Anticipated commencement date: Jul 15, 2025. Drilling days: Approximately 30.โฐ TIME-SENSITIVE
๐Ÿ“„ Section 1.8 Anticipated Starting Dates
Firm start date and duration provided in planning documents, indicating advanced scheduling and resource commitment.
2025-07-15 Drilling Rigs
Tier 3 CBL required on 9-5/8" intermediate casing prior to setting 7" casing, plus standard CBL on 7" casing.
๐Ÿ“„ Page 2
Extra cement bond log requirement beyond routine, indicating regulatory or operational concern about zonal isolation in intermediate string.
Relative General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval, page 1
Explicit, named regulatory point of contact required before pad construction begins, indicating heightened oversight or specific site sensitivities.
Relative General Oilfield Services
Tier 3 Operator asserts it will not use diesel-based compounds in hydraulic stimulation fluids and provides list of prohibited CAS numbers.
๐Ÿ“„ Section 1.9 DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Explicit prohibition of diesel in frac fluids, reflecting environmental policy or regulatory compliance strategy that influences chemical sourcing.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Anti-collision plan requires real-time corrected surveys, gamma ray correlation, and close approach monitoring with many offset wells. High-precision steering and survey services are critical for safe drilling given dense wellbore environment.
Cementing & Cased Hole Logging
Non-routine CBL requirements on intermediate string and wet shoe design demand precise cement job execution and evaluation. Additional logging runs create service opportunities pre- and post-cementing.
Stimulation & Completion Fluids
Operator's prohibition of diesel-based compounds mandates alternative fluid systems for fracturing. Chemical suppliers must provide compliant formulations.
Waste & Solids Disposal
Operator commits to using a licensed disposal facility for drill cuttings, listing several specific vendors. Hauling and disposal contracts will be awarded to one of these pre-vetted facilities.
Pad Construction & Earthwork
Permit requires contact with NDIC inspector prior to construction. Detailed earthwork quantities and pad design indicate imminent grading and construction activity in preparation for July 2025 spud.