| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Unique 500' north/south and 150' east/west boundary setbacks within 2240-acre spacing unit due to cemented production liner with wet shoe design ๐ Stipulations section, first page Non-standard setback distances tied to specific completion design (wet shoe with ability to frac out shoe) rather than typical 500' all-around setbacks |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore enters adjacent spacing unit requiring formal notification to competitor (Oasis Petroleum/Chord Energy) with detailed drilling/completion plansโฐ TIME-SENSITIVE ๐ Affidavit section at end of document Regulatory requirement (NDIC Order 31848) forces disclosure of proprietary drilling plans to adjacent operator before operations begin, revealing competitive intelligence |
2026-03-11 | General Oilfield Services |
| Tier 3 |
Specific NDIC Field Inspector contact (Marc Binns 701-220-5989) required for pre-construction notificationโฐ TIME-SENSITIVE ๐ Stipulations section, first page Named inspector with direct contact information indicates heightened regulatory oversight for this location |
Relative | General Oilfield Services |
| Tier 3 |
Mandatory closed mud system with cuttings hauled to specific licensed facility (Secure Energy Services at 13809 66th St NW, Williston ND) ๐ Disposal of Drill Cuttings section Pre-selected waste disposal vendor and explicit address provided in permit, not just generic requirement |
Unknown | Mud / Fluids |
| Tier 3 |
Production facilities not on same pad - wells flowline to CTB on William West Pad ๐ Pad Layout notes on sheet C-4 Centralized production facility design requires extensive flowline construction between pads |
Unknown | General Oilfield Services |