๐Ÿ›ข๏ธ LINDVIG NORTH 14-15-16-17F 1H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42938 ยท Generated 2026-08-22 01:50

API
3305310807
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Unique 500' north/south and 150' east/west boundary setbacks within 2240-acre spacing unit due to cemented production liner with wet shoe design
๐Ÿ“„ Stipulations section, first page
Non-standard setback distances tied to specific completion design (wet shoe with ability to frac out shoe) rather than typical 500' all-around setbacks
Unknown Completions / Frac
Tier 3 Wellbore enters adjacent spacing unit requiring formal notification to competitor (Oasis Petroleum/Chord Energy) with detailed drilling/completion plansโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit section at end of document
Regulatory requirement (NDIC Order 31848) forces disclosure of proprietary drilling plans to adjacent operator before operations begin, revealing competitive intelligence
2026-03-11 General Oilfield Services
Tier 3 Specific NDIC Field Inspector contact (Marc Binns 701-220-5989) required for pre-construction notificationโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, first page
Named inspector with direct contact information indicates heightened regulatory oversight for this location
Relative General Oilfield Services
Tier 3 Mandatory closed mud system with cuttings hauled to specific licensed facility (Secure Energy Services at 13809 66th St NW, Williston ND)
๐Ÿ“„ Disposal of Drill Cuttings section
Pre-selected waste disposal vendor and explicit address provided in permit, not just generic requirement
Unknown Mud / Fluids
Tier 3 Production facilities not on same pad - wells flowline to CTB on William West Pad
๐Ÿ“„ Pad Layout notes on sheet C-4
Centralized production facility design requires extensive flowline construction between pads
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Flowline construction
Explicit requirement to connect this pad to existing William West CTB pad for production handling
Specialized cementing services
Wet shoe design with ability to frac out shoe requires precise cementing for reduced boundary setbacks
Erosion control and berm construction
Mandatory perimeter berm and long-term erosion control plan required before construction commencement
Closed-loop drilling systems
Mandatory closed mud system with specific waste disposal routing creates immediate equipment and service need