๐Ÿ›ข๏ธ LINDVIG NORTH 14-15-16-17F 2H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42939 ยท Generated 2026-08-22 01:51

API
3305310808
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' north/south and 150' east/west setbacks within 2240-acre spacing unit, with west setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, Conditions of Approval
Specific setback requirements tied to completion design (wet shoe) and ability to frac out shoe, indicating a tailored regulatory approval based on engineered solution rather than standard setbacks
Unknown Completions / Frac
Tier 3 Operator notified Oasis Petroleum (Chord Energy) of directional drilling and completion plans for wells entering adjacent spacing unit per NDIC Order 31848, with affidavit dated March 11, 2026
๐Ÿ“„ Affidavit section at end of document
Proactive regulatory compliance with adjacent operator notification, revealing multi-well pad planning and potential coordination or conflict with competitor
2026-03-11 Directional Drilling
Tier 3 Closed mud system with no cuttings pit required; drill cuttings to be hauled to Secure Energy Services at 13809 66th St NW, Williston ND 58801
๐Ÿ“„ Stipulations section and Disposal of Drill Cuttings section
Explicit waste disposal vendor named (Secure Energy Services) and method mandated, locking in logistics chain
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Pre-construction contact with a named inspector is required, indicating heightened regulatory oversight or site-specific conditions
Relative General Oilfield Services
Tier 3 Wells on this pad flowline to the CTB on the William West Pad
๐Ÿ“„ Pad Layout notes
Infrastructure dependency on existing central tank battery (CTB) at another pad, indicating integrated production planning and potential constraints
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling waste management
Closed mud system mandated with cuttings hauled to Secure Energy Services; waste handling logistics must be secured pre-spud
Cementing and completion tools
Wet shoe design critical for regulatory approval and ability to frac out shoe; specific cementing program detailed with tailored slurries
Pad construction and earthwork
Pre-construction inspector contact required; detailed earthwork quantities and specifications provided; perimeter berm and erosion control mandated
Flowline construction
Wells will flow to existing CTB at William West Pad, requiring tie-in and potential capacity verification