๐Ÿ›ข๏ธ LINDVIG NORTH 14-15-16-17F 3H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42940 ยท Generated 2026-08-22 01:51

API
3305310809
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Production liner uses a 'wet shoe' design with ability to frac out the shoe, deviating from standard float equipment.
๐Ÿ“„ Stipulations section, page 1
Non-standard completion design choice that influences cementing, liner installation, and initial stimulation approach.
Unknown Completions / Frac
Tier 3 Wellbore enters adjacent spacing unit requiring notification to competitor (Oasis Petroleum/Chord Energy) per Order 31848โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit section, last pages
Regulatory requirement to share detailed drilling and completion plans with competitor before operations begin, indicating potential for coordination or conflict.
2026-03-11 Completions / Frac
Tier 3 Explicit requirement to contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Personalized regulatory contact with direct phone number, indicating a specific inspector is assigned and must be engaged before any ground disturbance.
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-awarded to Secure Energy Services at a specific Williston address.
๐Ÿ“„ Proposed Work section, 'Disposal of Drill Cuttings'
Vendor for waste hauling and disposal is explicitly named in the permit, indicating a contracted relationship.
Unknown General Oilfield Services
Tier 3 Wells on this pad flowline to a Central Tank Battery (CTB) on the 'WILLIAM WEST PAD'.
๐Ÿ“„ Pad Layout notes, Sheet C-1
Infrastructure dependency revealed; production from this new pad will tie into an existing facility on a different pad.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Must contact NDIC Inspector Marc Binns prior to construction. Detailed earthwork specs (compaction, materials) and quantified cut/fill volumes (83,850 CY) are provided, enabling precise bidding.
Directional Drilling & MWD
Complex trajectory with a long lateral (29,321' MD) crossing unit boundaries. Survey program specified (100'/30'/90' intervals). Target details and anti-collision review acknowledged.
Liner Hanger & Cementing Services
Non-standard 'wet shoe' production liner design requires specialized equipment and procedures for installation and subsequent 'frac out' of the shoe.
Flowline Construction
Required to connect this new pad to the existing William West CTB pad, creating a definite construction project post-drilling.
Regulatory & Land Coordination
Affidavit shows required notification to competitor (Oasis) was completed on 2026-03-11. This intent to drill is now known to the market, potentially accelerating offset operations.