| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner uses a 'wet shoe' design with ability to frac out the shoe, deviating from standard float equipment. ๐ Stipulations section, page 1 Non-standard completion design choice that influences cementing, liner installation, and initial stimulation approach. |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore enters adjacent spacing unit requiring notification to competitor (Oasis Petroleum/Chord Energy) per Order 31848โฐ TIME-SENSITIVE ๐ Affidavit section, last pages Regulatory requirement to share detailed drilling and completion plans with competitor before operations begin, indicating potential for coordination or conflict. |
2026-03-11 | Completions / Frac |
| Tier 3 |
Explicit requirement to contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, page 1 Personalized regulatory contact with direct phone number, indicating a specific inspector is assigned and must be engaged before any ground disturbance. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-awarded to Secure Energy Services at a specific Williston address. ๐ Proposed Work section, 'Disposal of Drill Cuttings' Vendor for waste hauling and disposal is explicitly named in the permit, indicating a contracted relationship. |
Unknown | General Oilfield Services |
| Tier 3 |
Wells on this pad flowline to a Central Tank Battery (CTB) on the 'WILLIAM WEST PAD'. ๐ Pad Layout notes, Sheet C-1 Infrastructure dependency revealed; production from this new pad will tie into an existing facility on a different pad. |
Unknown | General Oilfield Services |