| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
West setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Stipulations section, page 1 Regulatory variance allowing closer proximity to west boundary (150' vs standard 500') due to specific completion design with wet shoe and frac-out capability |
Unknown | Completions / Frac |
| Tier 3 |
Affidavit filed notifying Oasis Petroleum (Chord Energy) of directional plans through adjacent spacing unit per NDIC Order 31848 ๐ Affidavit section at end of document Formal regulatory notification to competitor about wellbores entering their unit, with directional plans shared |
2026-03-11 | Directional Drilling |
| Tier 3 |
Closed mud system with no cuttings pit required; cuttings to be hauled to Secure Energy Services at 13809 66th St NW, Williston ND ๐ Stipulations section page 1 and Disposal of Drill Cuttings section Pre-selected disposal vendor and specific address provided; closed system requirement |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section, page 1 Specific inspector named with direct contact requirement before construction begins |
Relative | General Oilfield Services |
| Tier 3 |
Wells on this pad flowline to CTB on the William West pad ๐ Pad Layout notes, Sheet C-1 Infrastructure dependency on existing central tank battery at different pad |
Unknown | General Oilfield Services |