๐Ÿ›ข๏ธ LINDVIG NORTH 14-15-16-17F 4H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42941 ยท Generated 2026-08-22 01:52

API
3305310810
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 West setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations section, page 1
Regulatory variance allowing closer proximity to west boundary (150' vs standard 500') due to specific completion design with wet shoe and frac-out capability
Unknown Completions / Frac
Tier 3 Affidavit filed notifying Oasis Petroleum (Chord Energy) of directional plans through adjacent spacing unit per NDIC Order 31848
๐Ÿ“„ Affidavit section at end of document
Formal regulatory notification to competitor about wellbores entering their unit, with directional plans shared
2026-03-11 Directional Drilling
Tier 3 Closed mud system with no cuttings pit required; cuttings to be hauled to Secure Energy Services at 13809 66th St NW, Williston ND
๐Ÿ“„ Stipulations section page 1 and Disposal of Drill Cuttings section
Pre-selected disposal vendor and specific address provided; closed system requirement
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Specific inspector named with direct contact requirement before construction begins
Relative General Oilfield Services
Tier 3 Wells on this pad flowline to CTB on the William West pad
๐Ÿ“„ Pad Layout notes, Sheet C-1
Infrastructure dependency on existing central tank battery at different pad
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling & surveying
Complex well paths with specific azimuth requirements (270ยฐ), KOP at 10376' MD, and regulatory requirement for certified surveys to certsurvey@nd.gov within specified frequencies
Cementing & liner services
West setback exception hinges on production liner cemented in lateral with wet shoe and ability to frac out shoe; specific cement designs with additives (Type III with salt, Calseal, Econolite, Versaset, Fe-2)
Pad construction & earthwork
Must contact NDIC Field Inspector Marc Binns before construction; detailed earthwork specifications (95-100% proctor compaction, specific moisture content); 83,850 CY excavation estimated