โ† Back to Daily Permits

๐Ÿ›ข๏ธ LINDVIG NORTH 14-15-16-17F 5H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42942 ยท Generated 2026-08-22 01:52

API
3305310811
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 West setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations section, first page
Non-standard setback approval indicates engineered completion design (wet shoe) to maximize lateral length within unit
Unknown Completions / Frac
Tier 3 Wellbore traverses adjacent spacing unit requiring formal notification to competitor (Oasis Petroleum/Chord Energy) per NDIC Order 31848
๐Ÿ“„ Affidavit section at end of document
Regulatory requirement triggers competitor awareness and potential coordination needs before drilling commences
2026-03-11 Drilling Rigs
Tier 3 First perforation point strategically placed approximately 100' from hard line and 250' from section line
๐Ÿ“„ Section Details in drilling plan
Precise perforation placement relative to boundaries indicates engineered completion for drainage optimization
Unknown General Oilfield Services
Tier 3 Explicit pre-construction contact requirement with NDIC Field Inspector Marc Binns (701-220-5989)โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, first page
Named inspector with direct contact requirement creates regulatory gate before location construction
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Secure Energy Services at specific Williston address
๐Ÿ“„ Proposed Drilling Plan section
Vendor pre-selection in permit document indicates established relationship and waste management strategy
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing & Liner Services
Wet shoe installation and ability to frac out shoe is critical for setback exception; specialized cementing required for production liner
Surveying & Well Placement
Complex pad with 5 wells requiring precise placement; boundary-relative perforation points need accurate execution
Waste Management
Closed mud system with cuttings disposal to pre-selected vendor creates immediate hauling opportunity
Regulatory Coordination
Mandatory pre-construction contact with named NDIC inspector creates timing dependency for all site work