๐Ÿ›ข๏ธ Isabella 6093 43-36 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Burke County, ND ยท File #42944 ยท Generated 2026-08-22 01:53

API
3301302035
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe completion design with 400' uncemented annulus at toe for wireline perforating
๐Ÿ“„ Discussion section, Fig. 1.1 Full Well Diagram and WetShoe configuration
Non-standard cementing technique to enable cheaper wireline perforating instead of tubing/tractor, indicating cost optimization and specific completion methodology
Unknown Completions / Frac
Tier 3 10-day comment period triggered due to Area of Interest (NDIC PP 2.01) with multiple agency comments including U.S. Fish and Wildlife Service requiring species surveys
๐Ÿ“„ Email correspondence section, FISH AND WILDLIFE SERVICE letter dated March 31, 2026
Regulatory delay and additional environmental compliance requirements (Class III cultural survey, species habitat surveys) before construction
2026-03-31 Drilling Rigs
Tier 3 Drill-back notification to adjacent operator Silver Hill Energy per Order No. 31848, with email notification sent on 3/26/2026
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION dated Wednesday, April 15, 2026
Demonstrates proactive regulatory compliance and inter-operator coordination for wells traversing adjacent spacing units
2026-03-26 General Oilfield Services
Tier 3 Use of indirect heater with setback exemption (Case No. 28949 Order No. 31500) allowing placement within 60' of wellhead and 21' of oil tank
๐Ÿ“„ FACILITY STATEMENT section
Non-standard facility design with regulatory variance, indicating pre-approved layout optimization
Unknown General Oilfield Services
Tier 3 Waiver requested for porosity and resistivity logs (geologic logs)
๐Ÿ“„ Page 4, PROPOSED LOGS section, Yes/No/Waiver column
Operator seeking to reduce data acquisition costs by waiving standard logging requirements, subject to NDIC approval via sundry
Unknown Regulatory / Permitting
Tier 3 Mandatory pre-construction inspection and contact with NDIC Field Inspector Jason Hicks (701-720-3523) before location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1-2, Construction Commencement Notification, Aquifer stipulation
Regulatory requirement for onsite inspection adds a mandatory step before pad construction can begin, creating timing dependency
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Regulatory Consulting
U.S. Fish and Wildlife Service comments require species surveys and Class III cultural survey per State Historical Society; immediate need for environmental assessment services
Directional Drilling & Anti-collision Services
Anti-collision statement details specific procedures (1.2 separation factor, gamma ray signatures, survey frequency); TAKTIKAL DIRECTIONAL already engaged but indicates complex well planning needs
Solid Waste Disposal/Hauling
List of 8 pre-approved licensed disposal facilities for drill cuttings; operator will use 'closest available facility' - opportunity for waste haulers serving those facilities
Pad Construction & Earthwork
Pre-construction inspection required with NDIC Field Inspector; detailed earthwork quantities provided (59,600 CY excavation); construction cannot start until inspection completed