| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Special north setback granted due to cemented production liner shoe preventing frac-out; reduced to 50' setback from north boundary ๐ Permit stipulations section Non-standard regulatory approval requiring specific engineering design (fully cemented shoe with no ability to frac out), allowing closer drilling to unit boundary |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore enters Bakken Pool outside target spacing unit, requiring compliance with NDIC Order 31973 ๐ Affidavit of Emily DiCarlo Complex multi-unit traversal requiring specific regulatory documentation; Hunt self-operates offset unit so no external notification needed |
2026-04-23 | General Oilfield Services |
| Tier 3 |
Operator must contact specific NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction ๐ Permit stipulations section Direct assignment to specific inspector indicates heightened regulatory oversight or pad-specific concerns; creates gatekeeping dependency |
Relative | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit mandated ๐ Permit stipulations section Non-standard waste management requirement increases need for cuttings handling and transport services |
Unknown | Mud / Fluids |
| Tier 3 |
Explicit statement that production liner shoe will be fully cemented with no ability to frac out the shoe ๐ Multiple locations including tubular details and permit stipulations Design constraint explicitly documented multiple times; suggests this is a critical permit condition rather than standard practice |
Unknown | Completions / Frac |