๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Special north setback granted due to cemented production liner shoe preventing frac-out; reduced to 50' setback from north boundary
๐Ÿ“„ Permit stipulations section
Non-standard regulatory approval requiring specific engineering design (fully cemented shoe with no ability to frac out), allowing closer drilling to unit boundary
Unknown Completions / Frac
Tier 3 Wellbore enters Bakken Pool outside target spacing unit, requiring compliance with NDIC Order 31973
๐Ÿ“„ Affidavit of Emily DiCarlo
Complex multi-unit traversal requiring specific regulatory documentation; Hunt self-operates offset unit so no external notification needed
2026-04-23 General Oilfield Services
Tier 3 Operator must contact specific NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction
๐Ÿ“„ Permit stipulations section
Direct assignment to specific inspector indicates heightened regulatory oversight or pad-specific concerns; creates gatekeeping dependency
Relative General Oilfield Services
Tier 3 Closed mud system with no cuttings pit mandated
๐Ÿ“„ Permit stipulations section
Non-standard waste management requirement increases need for cuttings handling and transport services
Unknown Mud / Fluids
Tier 3 Explicit statement that production liner shoe will be fully cemented with no ability to frac out the shoe
๐Ÿ“„ Multiple locations including tubular details and permit stipulations
Design constraint explicitly documented multiple times; suggests this is a critical permit condition rather than standard practice
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil construction and pad development
78,370 cubic yards of excavation planned; pad construction must begin after 3rd business day following permit publication but requires prior inspector contact
Cuttings handling and waste management
Closed mud system with no cuttings pit requires specialized handling; all cuttings hauled to approved facility
Cementing services
Critical design requirement for fully cemented production liner shoe with no ability to frac out; requires precise execution