| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Closed mud system with no cuttings pit required - environmental compliance mandate ๐ Stipulations section, page 1 Specific waste management requirement that dictates drilling fluid handling and disposal methods |
Unknown | Mud / Fluids |
| Tier 3 |
Perimeter berm required surrounding entire location - site construction specification ๐ Page 2 Mandatory containment infrastructure beyond standard pad construction |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction - specific inspector assignmentโฐ TIME-SENSITIVE ๐ Stipulations section, page 1 Direct regulatory contact requirement with named inspector, not generic office contact |
Relative | General Oilfield Services |
| Tier 3 |
Production liner shoe fully cemented with no ability to frac out the shoe - unique design constraint for completions ๐ Stipulations section, page 1 Unusual completion design that eliminates ability to frac out the shoe, impacting stimulation operations and requiring specialized completion techniques |
Unknown | Completions / Frac |
| Tier 3 |
Leak-proof container for filter socks must be maintained on-site from spud through flowback - extended duration requirementโฐ TIME-SENSITIVE ๐ Page 9 Container requirement spans entire well lifecycle from spud to flowback, not just drilling phase |
Relative | General Oilfield Services |