๐Ÿ›ข๏ธ OAKLAND 154-89-33-28H-3

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #42948 ยท Generated 2026-08-22 01:56

API
3306105695
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Closed mud system with no cuttings pit required - environmental compliance mandate
๐Ÿ“„ Stipulations section, page 1
Specific waste management requirement that dictates drilling fluid handling and disposal methods
Unknown Mud / Fluids
Tier 3 Perimeter berm required surrounding entire location - site construction specification
๐Ÿ“„ Page 2
Mandatory containment infrastructure beyond standard pad construction
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction - specific inspector assignmentโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Direct regulatory contact requirement with named inspector, not generic office contact
Relative General Oilfield Services
Tier 3 Production liner shoe fully cemented with no ability to frac out the shoe - unique design constraint for completions
๐Ÿ“„ Stipulations section, page 1
Unusual completion design that eliminates ability to frac out the shoe, impacting stimulation operations and requiring specialized completion techniques
Unknown Completions / Frac
Tier 3 Leak-proof container for filter socks must be maintained on-site from spud through flowback - extended duration requirementโฐ TIME-SENSITIVE
๐Ÿ“„ Page 9
Container requirement spans entire well lifecycle from spud to flowback, not just drilling phase
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Complex multi-well pad with close spacing requires precise directional control; anti-collision analysis shows tight tolerances (1.5-3.8 ft separations)
Closed-loop drilling fluid systems
Mandatory closed mud system with no cuttings pit creates immediate need for specialized fluid handling and waste management
Pad construction and earthwork
78,370 CY excavation with specific berm requirements; pad designed for five wells with detailed grading specifications
Completions engineering
Unique cemented production liner shoe design requires specialized completion approach; cannot frac out shoe
Regulatory compliance and inspection coordination
Specific inspector contact required before construction; multiple time-sensitive notifications (spud, sundry notices within 3 business days)