๐Ÿ›ข๏ธ SEVERANCE 153-89-4-9H-4

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #42950 ยท Generated 2026-08-22 01:57

API
3306105697
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Wellbore enters Bakken Pool outside target spacing unit, requiring special affidavit and notice procedures per NDIC Order 31848
๐Ÿ“„ Affidavit of Emily DiCarlo section
Indicates complex regulatory compliance due to wellbore traversing adjacent spacing unit, requiring specific documentation and coordination
2026-04-23 General Oilfield Services
Tier 3 Anti-collision analysis shows close approaches to multiple offset wells on same pad (Separation Factors as low as 1.581)
๐Ÿ“„ Anticollision Report section
High-density drilling environment with tight well spacing requiring precise directional control
2026-04-14 Directional Drilling
Tier 3 Mandatory contact with NDIC Field Inspector Calob Werre prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval section, page 1
Specific inspector assignment with direct contact requirement before construction begins
Relative General Oilfield Services
Tier 3 Production liner shoe fully cemented with no ability to frac out the shoe - specific south setback reduction to 50'
๐Ÿ“„ Conditions of Approval section, page 1
Unusual completion design constraint that affects fracture stimulation operations and wellbore placement
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Survey Services
Critical due to tight anti-collision requirements (Separation Factors as low as 1.581) and precise placement needed for regulatory compliance with spacing unit boundaries
Regulatory Compliance & Inspection Coordination
Mandatory pre-construction contact with specific NDIC inspector (Calob Werre); complex spacing unit crossing requires affidavit and documentation
Cementing & Completion Services
Unusual requirement for fully cemented production liner shoe with no ability to frac out; affects completion design and requires specialized cementing expertise
Pad Construction & Earthwork
Large-scale pad development (78,370 CY excavation) with 5 wells; detailed engineering plans already prepared by KLJ Engineering