| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Toe setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 1, Conditions of Approval Specifies wet shoe completion design enabling wireline toe initiation, avoiding tubing/tractor |
Unknown | Completions / Frac |
| Tier 3 |
Waiver requested for adjacent operator notification (Order 31973) because Enerplus is operator of adjacent spacing unit ๐ Affidavit and notification letter Well pads target off-lease units; operator drilling from surface location outside spacing unit |
2026-04-27 | Regulatory / Permitting |
| Tier 3 |
Anticipated commencement date: July 15, 2025โฐ TIME-SENSITIVE ๐ Section 1.8 Anticipated Starting Dates Specific start date provided in planning documents, not just permit approval date |
2025-07-15 | General Oilfield Services |
| Tier 3 |
Approval conditional on 150' setback from south boundary at heel and toe, 500' from north, east, and west boundaries within 1280-acre unit ๐ Page 1, Stipulations section Tight boundary constraints indicate pad optimization and potential anti-collision challenges in dense field |
Unknown | Directional Drilling |
| Tier 3 |
Deep-set surface casing required (2140' min); 17-1/2" hole and/or 13-3/8" casing must not penetrate Mowry Formation ๐ Page 2 Unusual casing design with geological constraint; mud logger required from ground to TD of surface hole |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE ๐ Page 3 Specific inspector named with direct contact requirement; indicates heightened regulatory oversight or site-specific issues |
Relative | General Oilfield Services |
| Tier 3 |
Multiple Cement Bond Log (CBL) requirements: radial/ultrasonic on 13-3/8" surface casing, on 9-5/8" intermediate prior to setting 7" casing, and standard on 7" casing ๐ Page 2 Enhanced cement verification regimen beyond routine, including zero-pressure pass and wait time for compressive strength |
Unknown | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit; cuttings to be hauled to licensed disposal facility ๐ Page 1 and Licensed Facilities list Mandates dry cuttings handling and off-site disposal at one of 8 named facilities |
Unknown | Mud / Fluids |