๐Ÿ›ข๏ธ PILSNER 2511-1BHN

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #42953 ยท Generated 2026-08-22 01:59

API
3302301803
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Conditional approval based on production liner cemented in lateral with wet shoe and ability to frac out shoe for north setback
๐Ÿ“„ Stipulations section, page 1
Unusual regulatory condition tying approval to specific completion technique (wet shoe with frac-out capability) rather than standard setbacks
Unknown Completions / Frac
Tier 3 Affidavit shows surface use agreement executed April 1, 2026, but previous affidavit (March 26, 2026) stated still in negotiationโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit of Surface Use Agreement pages
Surface access secured just before permit approval (05/19/2026), indicating urgency in land negotiations
2026-04-01 Drilling Rigs
Tier 3 Closed mud system with no cuttings pit - all cuttings hauled to 13 Mile Landfill, Williston, ND
๐Ÿ“„ Stipulations page 1 and Drilling Fluids Program page 4
Mandated closed-loop system with specific disposal facility named
Unknown Mud / Fluids
Tier 3 Existing Nelson 'B' 1 dry hole on proposed pad - reserve pit must be excavated if encountered during pad construction
๐Ÿ“„ Stipulations section, page 1
Legacy well contamination risk requiring remediation before pad construction can proceed
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification, page 2
Specific inspector named with direct contact requirement, not generic notification
Relative General Oilfield Services
Tier 3 Tie-back frac string contingency plan if mechanical issues with 7" intermediate casing
๐Ÿ“„ Completion Program section, page 5
Pre-planned contingency for casing integrity issues during completion
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork/Remediation
Immediate need to excavate potential reserve pit from Nelson 'B' 1 dry hole before pad construction; 85,210 cu yds of earthwork planned
Specialized Cementing
Wet shoe with frac-out capability required by regulatory condition; 50/50 Poz cement blend specified for production casing
Waste Hauling/Disposal
Closed-loop system mandates hauling all cuttings to 13 Mile Landfill; filter sock container required on-site from spud through flow-back
Directional Drilling/Survey
KLX pre-selected but anti-collision modeling shows Level 3 separation factor with offset wells, indicating complex well planning