๐Ÿ›ข๏ธ PILSNER 2514-3BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #42954 ยท Generated 2026-08-22 02:00

API
3302301804
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Lateral will be fully cemented using a wet shoe with ability to frac out the toe.
๐Ÿ“„ Completion Program section
Specific cementing technique (wet shoe) chosen to enable toe fracturing, indicating planned stimulation design that includes the shoe track.
Unknown Completions / Frac
Tier 3 Wellbore enters Bakken outside target spacing unit, requiring waiver from Order 31973 notification to adjacent operator (which is KODA itself).
๐Ÿ“„ Letter to Todd Holweger dated March 26, 2026
Reveals complex unit boundary crossing and reliance on internal waiver rather than external operator coordination, simplifying regulatory process.
2026-03-26 Regulatory / Permitting
Tier 3 Surface Use Agreement was pending (verbal permission only) at permit submission, with executed agreement dated later.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit of Pending Surface Use Agreement (March 26, 2026) and Affidavit of Surface Use Agreement (April 23, 2026)
Operator submitted permit with only verbal surface owner agreement, indicating urgency or aggressive timeline. Executed agreement came nearly a month later.
2026-03-26 General Oilfield Services
Tier 3 Existing Nelson 'B' 1 dry hole and potential reserve pit on proposed pad location requiring excavation and hauling.
๐Ÿ“„ Stipulations section
Adds non-routine pre-construction earthwork and waste disposal scope. Encountering old reserve pit is unpredictable and requires specialized handling.
Unknown General Oilfield Services
Tier 3 Requirement to contact NDIC Field Inspector Marc Binns (701-220-5989) PRIOR to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification
Specific inspector named with direct contact requirement adds a regulatory gate before any dirt work.
Relative General Oilfield Services
Tier 3 Mandatory closed mud system with cuttings hauled to offsite facility (13 Mile Landfill, Williston, ND), no cuttings pit allowed.
๐Ÿ“„ Stipulations and Proposed Work sections
Eliminates traditional pit disposal, mandating containerized cuttings and specific offsite disposal location.
Unknown Mud / Fluids
Tier 3 Frac string will not be used; stimulation will be pumped via 7" intermediate casing.
๐Ÿ“„ Completion Program section
Operator opting for casing fracs instead of running dedicated frac string, reducing tubular costs but increasing casing risk.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork & Environmental Site Prep
Immediate need to excavate potential old reserve pit from Nelson 'B' 1 well before pad construction. Specific requirement to haul to approved facility.
Drilling Waste Hauling & Disposal
Closed mud system mandated with cuttings to 13 Mile Landfill. Continuous hauling required throughout drilling. No pit option creates steady containerized waste stream.
Casing Inspection & Pressure Testing
Casing frac design (no frac string) increases reliance on 7" intermediate casing integrity. Pre-frac casing evaluation and pressure testing services become critical path items.
Pad Construction & Access Road Building
Detailed pad layout with 5,729' proposed access road and specific construction requirements (perimeter berm, impermeable dikes). Construction cannot start until inspector contact made.