Wellbore enters adjacent spacing unit requiring regulatory waiver from Order 31973 ๐ Letter to Todd Holweger dated March 26, 2026 Well trajectory crosses into adjacent spacing unit (Sections 1, 12, 13: ALL, T161N, R103W AND Section 36, T162N, R103W), requiring special regulatory coordination and waiver request. This indicates complex unit boundary management. |
2026-03-26 | Regulatory / Permitting |
| Tier 3 |
Surface Use Agreement was pending at permit submission with only verbal permissionโฐ TIME-SENSITIVE ๐ Affidavit of Pending Surface Use Agreement dated March 26, 2026 Operator submitted permit with only verbal surface owner permission while formal agreement was still being negotiated. This indicates urgency to secure permit ahead of finalized surface terms. |
2026-03-26 | General Oilfield Services |
| Tier 3 |
Production liner cemented with wet shoe and ability to frac out the shoe ๐ Stipulations and Completion Program sections Specific cementing design with wet shoe for toe frac capability. Indicates planned stimulation through liner shoe. |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with cuttings hauled to specific offsite facility (13 Mile Landfill, Williston, ND) ๐ Proposed Work and Drilling Fluids Program sections Explicit waste disposal plan using closed-loop system and named disposal facility. Non-routine commitment to specific landfill. |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Marc Binnsโฐ TIME-SENSITIVE ๐ Stipulations section Specific inspector named with direct phone contact required prior to location construction. Indicates heightened regulatory oversight for this pad. |
Relative | General Oilfield Services |
| Tier 3 |
Existing Nelson 'B' 1 dry hole on pad with potential reserve pit excavation requirement ๐ Stipulations section Regulatory stipulation requires excavation and hauling of any encountered reserve pit from legacy well to approved facility. Adds environmental remediation scope to pad construction. |