๐Ÿ›ข๏ธ AMBER 3119-1BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #42966 ยท Generated 2026-08-22 02:01

API
3302301811
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 North setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Page 1 of 10
Specific engineering design constraint affecting completion approach - wet shoe cementing with frac-out capability
Unknown Completions / Frac
Tier 3 Well pad located on aquifer requiring closed mud system, no drilling pit, and impermeable liner
๐Ÿ“„ Page 2 of 10
Unusual environmental constraint requiring specialized containment systems and additional NDIC field inspector oversight
2026-05-21 Mud / Fluids
Tier 3 Waiver granted to 3-day waiting period for construction/operations after permit approvalโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, Affidavit Request for Waiver letter
Operator secured expedited start, indicating urgency to begin pad development and bypass standard regulatory waiting period
2026-02-26 Regulatory / Permitting
Tier 3 Operator plans to submit sundry to waive open hole logs
๐Ÿ“„ Drilling Plan - Evaluation Program section
Non-standard data acquisition approach reduces logging costs but increases reliance on MWD and casing evaluation logs
Relative General Oilfield Services
Tier 3 Multi-well pad with 6 future well locations identified on pad layout
๐Ÿ“„ Pad Layout diagram, Multi-well plan
Pad designed for significant expansion beyond the 3 permitted wells, indicating long-term development plans
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Closed-loop drilling systems and environmental containment
Aquifer location requires closed mud system, impermeable liner, and specialized containment - immediate need upon permit approval 5/21/2026
Directional drilling and anti-collision services
KLX Directional already engaged but complex pad with multiple wellbores requires continuous monitoring; anticollision report shows close approaches (3.695 ft separation factor)
Cementing with wet shoe expertise
North setback approval conditional on production liner cemented with wet shoe and ability to frac out shoe - specialized cementing required
Earthwork and pad construction
63,700 cubic yards of earthwork planned; pad construction can begin immediately after 5/21/2026 due to waiver; designed for 6 future wells
Frac fluid and proppant supply
Slick water frac planned; pumping down 7" intermediate casing; no diesel fuels used - standard Bakken completion but large pad scale