๐Ÿ›ข๏ธ SMOKY BUTTE 160-100-6-18H-3

HUNT OIL COMPANY ยท Divide County, ND ยท File #42967 ยท Generated 2026-08-22 02:02

API
3302301812
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Page 1, Stipulations section
Specific setback requirements tied to completion design (wet shoe) indicate regulatory accommodation for planned completion technique, creating constraints for well placement and potential interference management.
Unknown Directional Drilling
Tier 2 Well will be completed via wet shoe assembly placed at least 150' from section line
๐Ÿ“„ Drilling program section (near end)
Explicit declaration of completion method using wet shoe assembly, which is less common than standard plug-and-perf, indicating specific completion design intent.
Unknown Completions / Frac
Tier 3 Operator asserts no notice required for off-spacing drilling because Hunt is operator of offset spacing unit (per NDIC Order 31973)
๐Ÿ“„ Affidavit of Emily DiCarlo
Operator leveraging internal control of adjacent units to streamline regulatory process for off-spacing wells, indicating strategic acreage position.
2026-05-22 General Oilfield Services
Tier 3 Affidavit requirement met via executed Surface Damage Settlement and Access Agreement with surface owners Robert and Shanna Rude for pad in SESE Section 34
๐Ÿ“„ Affidavit of Ryan Harkins
Surface access legally secured via specific agreement, reducing regulatory risk and enabling pad construction; surface owner relationship established.
2026-05-20 General Oilfield Services
Tier 3 Anti-collision report shows close approaches (1.5-5.8 separation factor) with multiple wells on same pad, including Smoky Butte 160-100-6-18H-2 at 4.394 separation factor
๐Ÿ“„ Anti-collision Report section
Detailed anti-collision analysis performed with specific separation factors indicating tight well spacing on pad requiring precise directional control.
2026-04-23 Directional Drilling
Tier 3 Mandatory contact with NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Conditions of Approval
Specific inspector named with direct contact requirement indicates heightened regulatory oversight or site-specific concerns requiring pre-construction coordination.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling with precise anti-collision capabilities
Anti-collision report shows tight spacing (1.5-5.8 separation factors) requiring high-precision drilling; pad has multiple wells in close proximity.
Wet shoe completion specialists
Explicit declaration of wet shoe completion method; requires specific equipment and expertise for liner placement and shoe fracturing.
Civil construction with regulatory coordination
Mandatory contact with specific NDIC inspector prior to construction; pad requires significant earthwork (18,020 CY excavation).
Survey and pad design engineering
KLJ Engineering already engaged but multi-pad development suggests ongoing need for survey and design services.