| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Page 1, Stipulations section Specific setback requirements tied to completion design (wet shoe) indicate regulatory accommodation for planned completion technique, creating constraints for well placement and potential interference management. |
Unknown | Directional Drilling |
| Tier 2 |
Well will be completed via wet shoe assembly placed at least 150' from section line ๐ Drilling program section (near end) Explicit declaration of completion method using wet shoe assembly, which is less common than standard plug-and-perf, indicating specific completion design intent. |
Unknown | Completions / Frac |
| Tier 3 |
Operator asserts no notice required for off-spacing drilling because Hunt is operator of offset spacing unit (per NDIC Order 31973) ๐ Affidavit of Emily DiCarlo Operator leveraging internal control of adjacent units to streamline regulatory process for off-spacing wells, indicating strategic acreage position. |
2026-05-22 | General Oilfield Services |
| Tier 3 |
Affidavit requirement met via executed Surface Damage Settlement and Access Agreement with surface owners Robert and Shanna Rude for pad in SESE Section 34 ๐ Affidavit of Ryan Harkins Surface access legally secured via specific agreement, reducing regulatory risk and enabling pad construction; surface owner relationship established. |
2026-05-20 | General Oilfield Services |
| Tier 3 |
Anti-collision report shows close approaches (1.5-5.8 separation factor) with multiple wells on same pad, including Smoky Butte 160-100-6-18H-2 at 4.394 separation factor ๐ Anti-collision Report section Detailed anti-collision analysis performed with specific separation factors indicating tight well spacing on pad requiring precise directional control. |
2026-04-23 | Directional Drilling |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE ๐ Page 1, Conditions of Approval Specific inspector named with direct contact requirement indicates heightened regulatory oversight or site-specific concerns requiring pre-construction coordination. |
Relative | General Oilfield Services |