๐Ÿ›ข๏ธ SMOKY BUTTE 160-100-5-17H 1

HUNT OIL COMPANY ยท Divide County, ND ยท File #42968 ยท Generated 2026-08-22 02:02

API
3302301813
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Page 1, STIPULATIONS section
Specific setback conditions tied to completion design (wet shoe) and ability to frac out shoe, indicating a tailored regulatory approval for this well's geometry and completion method.
Unknown Completions / Frac
Tier 3 Affidavit confirms executed Surface Damage Settlement and Access Agreement with surface owners Robert & Shanna Rude for pad in SESE Section 34.
๐Ÿ“„ Affidavit of Ryan Harkins
Surface access legally secured and documented via affidavit filed with permit, de-risking pad construction and access.
2026-05-20 General Oilfield Services
Tier 3 Anticollision report shows close approach (Separation Factor 1.993) with Alexandria 161-100-35-23H-1 wellbore.
๐Ÿ“„ Anticollision Report Summary
Quantified collision risk with another planned well on the same pad, requiring precise directional control.
2026-04-23 Directional Drilling
Tier 3 Well will be completed via wet shoe assembly placed at least 150' from section line.
๐Ÿ“„ Drilling program schematic notes
Explicit completion method declared in planning documents, not just permit. Wet shoe assembly indicates a specific liner hanger and completion technique.
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit required.
๐Ÿ“„ Page 1, Conditions of Approval
Non-standard waste handling mandate; eliminates traditional cuttings pit, requiring alternative (haul-off) disposal from spud.
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Conditions of Approval
Direct, named inspector contact required before pad construction begins, indicating heightened regulatory oversight or site-specific sensitivities.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Pad Building
Permit approved 5/22/2026. Construction cannot start until 3rd business day after permit publication AND after contacting Inspector Marc Binns. Dirt work, berm construction, and impermeable base/dike construction are mandated.
Closed-Loop Drilling & Cuttings Hauling
'Closed mud system with no cuttings pit' is a condition. Service providers for fluid systems, solids control, and hauling to approved facilities are required from spud.
Directional Drilling & MWD
High-precision drilling required due to close anti-collision factors (as low as 1.993 SF). Survey frequency mandates (100ft in vertical, 30ft in curve, 90ft in lateral) must be followed. Scientific Drilling is already engaged in planning.
Liner Hanging & Completion Services
Wet shoe assembly is specified for completion. Services for running and cementing the production liner, setting the hanger, and subsequent frac shoe operations are locked into the design.