๐Ÿ›ข๏ธ MORRIS 11-2-35-26 3H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42973 ยท Generated 2026-08-22 02:04

API
3305310816
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe design with ability to frac out the toe
๐Ÿ“„ Stipulations and Wellbore Details
Specific engineering requirement for production liner cementing with wet shoe, plus backup hyd toe sleeve in case of failure
Unknown Completions / Frac
Tier 3 Backbuild order waiver requested for wells entering Bakken outside target spacing unit
๐Ÿ“„ Letter from Phoenix Energy to NDIC Permit Manager
Operator is proactively seeking regulatory relief from NDIC Order 31848 notification requirements, indicating complex pad design with wells traversing adjacent units
2026-04-21 Regulatory / Permitting
Tier 3 Closed mud system with cuttings disposal to specific licensed facility
๐Ÿ“„ Disposal of Drill Cuttings section
Explicitly names Select Water Solutions, LLC Special Waste Landfill at 13195 26th St NW Arnegard, ND 58835 as disposal destination
Unknown Mud / Fluids
Tier 3 First perforation point at specific distances from hard line and section line
๐Ÿ“„ Wellbore Details
Precise geometric positioning (approx 100' from hard line, 250' from section line) indicates careful boundary management
Unknown General Oilfield Services
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspector
๐Ÿ“„ Stipulations section
Explicit requirement to contact Monica Bleess (701-290-8633) prior to location construction, not just generic inspector notification
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Survey Services
Complex pad design with anti-collision concerns; Taktikal Directional already engaged but rig is TBD indicating opportunity
Waste Management & Logistics
Closed mud system with specific disposal facility requirement; need for compliant transport and disposal coordination
Pad Construction & Earthwork
Detailed earthwork quantities (49,860 cu yds); specific access road requirements; pre-construction inspector contact required
Completion & Stimulation Services
Wet shoe design with frac-out capability; specific perforation placement requirements; diesel-free stimulation commitment