โ† Back to Daily Permits

๐Ÿ›ข๏ธ MORRIS 11-2-35-26 4H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42974 ยท Generated 2026-08-22 02:04

API
3305310817
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, Permit Review Policy
Specific setback requirements tied to completion design (wet shoe) rather than standard regulations, indicating engineered approach to boundary compliance
Unknown Completions / Frac
Tier 3 Operator requesting waiver from backbuild order notification requirements citing no active operators in adjacent spacing unit
๐Ÿ“„ Letter from Phoenix Energy to NDIC dated April 21st, 2026
Proactive regulatory engagement to waive notification requirements for wells entering Bakken system outside target spacing unit
2026-04-21 Regulatory / Permitting
Tier 3 First perforation point at approximately 100' from hard line and 250' from section line
๐Ÿ“„ Completion details in well schematic section
Precise perforation placement relative to property boundaries indicates careful geometric planning for fracture propagation
Unknown Completions / Frac
Tier 3 Must be drilled in conjunction with a well that meets 1220' setback from east and west spacing unit boundaries to justify spacing unit
๐Ÿ“„ Page 2 of 10, Conditions of Approval
This well's approval is contingent on another well meeting stricter setback requirements, indicating pad development sequencing dependency
Unknown General Oilfield Services
Tier 3 Closed mud system with no cuttings pit required; cuttings to be hauled to Select Water Solutions, LLC Special Waste Landfill
๐Ÿ“„ Stipulations and Disposal of Drill Cuttings section
Specific waste disposal vendor pre-selected and named in permit, not just generic requirement
Unknown Mud / Fluids
Tier 3 Phoenix must contact NDIC Field Inspector Monica Bleess at 701-290-8633 prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Specific inspector named with direct contact requirement before construction begins
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Taktikal Directional already designed plan; directional contractor needed to execute precise wellbore placement with specific survey requirements (100' vertical, 30' curve, 90' lateral frequency)
Cementing Services
Complex cementing program with specific slurry designs for surface, intermediate, and production casing; wet shoe installation critical for setback compliance
Waste Management
Closed mud system required with cuttings going to pre-selected landfill; filter sock container must be on-site from spud through flow-back
Pad Construction & Earthwork
Must contact specific NDIC inspector before construction; detailed earthwork quantities and pad layout provided; 50' access roads required