| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within 2560-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Stipulations section, Permit Review Policy Specific setback requirements tied to completion design (wet shoe) rather than standard regulations, indicating engineered approach to boundary compliance |
Unknown | Completions / Frac |
| Tier 3 |
Operator requesting waiver from backbuild order notification requirements citing no active operators in adjacent spacing unit ๐ Letter from Phoenix Energy to NDIC dated April 21st, 2026 Proactive regulatory engagement to waive notification requirements for wells entering Bakken system outside target spacing unit |
2026-04-21 | Regulatory / Permitting |
| Tier 3 |
First perforation point at approximately 100' from hard line and 250' from section line ๐ Completion details in well schematic section Precise perforation placement relative to property boundaries indicates careful geometric planning for fracture propagation |
Unknown | Completions / Frac |
| Tier 3 |
Must be drilled in conjunction with a well that meets 1220' setback from east and west spacing unit boundaries to justify spacing unit ๐ Page 2 of 10, Conditions of Approval This well's approval is contingent on another well meeting stricter setback requirements, indicating pad development sequencing dependency |
Unknown | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit required; cuttings to be hauled to Select Water Solutions, LLC Special Waste Landfill ๐ Stipulations and Disposal of Drill Cuttings section Specific waste disposal vendor pre-selected and named in permit, not just generic requirement |
Unknown | Mud / Fluids |
| Tier 3 |
Phoenix must contact NDIC Field Inspector Monica Bleess at 701-290-8633 prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section Specific inspector named with direct contact requirement before construction begins |
Unknown | General Oilfield Services |