๐Ÿ›ข๏ธ GO-Wolla- 157-97-3422H-3

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #42977 ยท Generated 2026-08-22 02:06

API
3310506836
Target Formation
Bakken (Middle Bakken)
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on specific lateral setback design: 150' from N/S boundaries, 500' from E/W boundaries within 1920-acre spacing unit. North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ STIPULATIONS section, Permit Review Policy
Regulatory approval is tied to a specific, non-standard completion design (cemented liner with wet shoe). This imposes a technical constraint on the completion operation and indicates a tailored solution for boundary proximity.
2026-05-27 Completions / Frac
Tier 3 Detailed, engineered pad and access road design by KLJ Engineering, with extensive specifications for compaction, materials, erosion control, and interim reclamation.
๐Ÿ“„ KLJ Engineering civil layout sheets (NDP-GBAK-CIV-LAY-01077, etc.)
The pad is not a standard design; it includes specific material specs (e.g., clay for containment berms), cement stabilization, detailed stormwater management, and a 13.19-acre disturbance plan. This indicates a high-investment, permanent facility.
2026-08-25 General Oilfield Services
Tier 3 Operator requests waiver for providing directional/completion plans to adjacent unit operator, as Hess is the operator of the adjacent unit.
๐Ÿ“„ Letter from Derek Abrahamsen (Hess) to NDIC dated April 14, 2026
Demonstrates proactive regulatory strategy to streamline permitting by waiving inter-operator notification requirements for off-spacing wells drilled from a Hess-operated pad into a Hess-operated unit.
2026-04-14 Directional Drilling
Tier 3 Anticollision report shows planned well path has Level 2 and Level 3 separation factor warnings with multiple existing wellbores, including a closest approach with a separation factor of 1.109 (Level 2).
๐Ÿ“„ Anticollision Report summary table
Drilling through a dense wellbore environment requires precise geosteering and real-time anti-collision monitoring. The plan acknowledges close approaches managed by risk assessments and MOC's.
2026-04-10 Directional Drilling
Tier 3 Affidavit confirms Surface Use Agreement executed effective August 1, 2025, for off-spacing wells drilled from Section 6 into Sections 22, 27, 34.
๐Ÿ“„ Affidavit of Travis Nelson, sworn March 24, 2026
Surface access was secured well in advance (over 7 months prior to affidavit) for specific off-spacing operations, indicating long-term planning and resolved landowner negotiations.
2025-08-01 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford (701-946-8204) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ STIPULATIONS section, Conditions of Approval
Explicit, named regulatory pre-construction contact is required. This indicates heightened regulatory oversight or site-specific conditions requiring inspector notification before dirt work begins.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Pad construction must follow detailed KLJ Engineering plans. The permit requires contact with NDIC Inspector Robert Stafford prior to construction, creating an immediate pre-construction action item. Quantities are defined (e.g., 31,094 CY excavation).
Directional Drilling & MWD/LWD Services
High anti-collision risk necessitates precise execution of the Scientific Drilling plan. Requires real-time survey tools (MWD+IFR1+MS), geosteering, and adherence to strict survey frequencies (every 93'-100', increasing as needed).
Cementing & Completions
Permit condition mandates a cemented production liner with a wet shoe and the 'ability to frac out the shoe.' This is a non-standard design requirement for the completion. Halliburton is pre-selected for stimulation.
Environmental & Reclamation Services
Interim reclamation is part of the engineered plan. Specific seeding mixes, erosion control logs (fiber rolls), and blanket installation are specified, requiring specialized contractors post-construction.