๐Ÿ›ข๏ธ GINA FERRARI 13-12-1 5H

Phoenix Operating LLC ยท Divide County, ND ยท File #42983 ยท Generated 2026-08-22 02:07

API
3302301814
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, page 1
Specific setback requirements tied to completion design (wet shoe) and ability to frac out shoe, indicating regulatory focus on wellbore placement and completion integrity
Unknown Completions / Frac
Tier 3 Operator submitted backbuild order waiver request for 12-well pad (CANDY FERRARI and GINA FERRARI wells) citing Phoenix Energy as offset operator of adjacent sections
๐Ÿ“„ Letter from Phoenix Energy dated February 5, 2026
Shows operator proactively managing regulatory requirements for multi-well pad where wells enter Bakken outside target spacing unit; cites internal company relationship (Phoenix Energy) to streamline notification
2026-02-05 Regulatory / Permitting
Tier 3 Well must be drilled in conjunction with another well meeting 1220' setback from east/west spacing unit boundaries to justify spacing unit
๐Ÿ“„ Page 2
Spacing unit justification depends on drilling another well with specific setbacks, indicating pad development coordination and regulatory interdependence
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Specific inspector named with direct contact requirement before construction begins, indicating heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services
Tier 3 Drill cuttings disposal explicitly contracted to Smoky Butte Environmental, LLC at specific Fortuna, ND address
๐Ÿ“„ Disposal of Drill Cuttings section
Vendor pre-selected and specified in permit documents, locking in waste disposal provider before operations begin
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
Detailed directional plan already created by Taktikal Directional; operator has specific trajectory requirements including kick-off at 9532' MD and landing in Middle Bakken target; survey frequency requirements specified
Waste Management & Environmental Services
Smoky Butte Environmental pre-selected for cuttings disposal; closed mud system required; filter sock container requirements with specific timeline (from spud through flow-back)
Pad Construction & Earthwork
Must contact NDIC Field Inspector Robert Stafford before construction; detailed pad layout with 14.8 acres disturbance; approximate earthwork quantities calculated (82,380 cu yds cut, 68,580 cu yds fill)
Cementing & Completions
Specific cement designs for surface, intermediate, and production liner; wet shoe completion design required for regulatory compliance; ability to frac out shoe explicitly needed