๐Ÿ›ข๏ธ GINA FERRARI 13-12-1 4H

Phoenix Operating LLC ยท Divide County, ND ยท File #42984 ยท Generated 2026-08-22 02:07

API
3302301815
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval condition requires production liner cemented in lateral with wet shoe and ability to frac out shoe for north setback compliance
๐Ÿ“„ Stipulations section, NDIC Field Order Info
Specific completion technique mandated by regulator for boundary compliance, not standard practice
Unknown Completions / Frac
Tier 3 Backbuild Order Waiver request for multi-well pad drilling outside target spacing unit
๐Ÿ“„ Letter from Phoenix Energy dated February 5, 2026
Regulatory waiver request for complex multi-well pad development crossing spacing units
2026-02-05 Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy section
Pre-construction regulatory contact requirement with specific inspector
Relative General Oilfield Services
Tier 3 Operator acknowledges 21-31 day prior written notice to offset operators for completions within 2,640 feetโฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions section, Page 7
Extended notification window for offset operators exceeds standard requirements
Relative General Oilfield Services
Tier 3 Specific disposal facility pre-selected: Smoky Butte Environmental, LLC
๐Ÿ“„ Disposal of Drill Cuttings section
Explicit vendor selection for waste disposal, not just generic requirement
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Taktikal Directional already engaged for design; survey program specified with OWSG MWD tools; opportunity for execution phase
Specialized cementing services
Complex cement program with wet shoe requirement, multiple cement types and additives specified
Environmental and waste management
Closed mud system required, specific disposal vendor named but potential for secondary services
Pad construction and earthwork
Detailed pad design with 82,380 cubic yards of earthwork; access roads specified; construction cannot start without inspector contact
Completion and stimulation services
21-31 day notification window creates predictable timeline; wet shoe frac-out capability required