| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback approval conditional on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2, Stipulations section Specific engineering requirement for liner cementing and shoe frac-out capability tied to regulatory approval, indicating a non-standard completion design constraint |
2026-05-29 | Completions / Frac |
| Tier 2 |
Backbuild Order Waiver request for entire 11-well pad due to wells entering Bakken system outside target spacing unit ๐ Letter from Meaghan Coughlan dated February 5, 2026 Regulatory waiver request for pad-wide drilling plan where wells traverse adjacent spacing units, indicating complex multi-well trajectory design |
2026-02-05 | Directional Drilling |
| Tier 3 |
Must drill in conjunction with a well that meets 1220' setback from east/west spacing unit boundaries to justify spacing unit ๐ Page 3, Stipulations section This well's approval is contingent on another well being drilled with specific boundary setbacks, indicating pad-wide coordination requirement |
2026-05-29 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2, Stipulations section Specific inspector named with direct pre-construction contact requirement, not generic notification |
Relative | General Oilfield Services |
| Tier 3 |
Cement volumes for 7" production casing calculated to provide top of cement to 3989', with note that actual volumes may vary and may be determined by caliper log ๐ Proposed Cementing Program section Explicit mention of potential need for caliper log to determine cement volumes, indicating anticipated hole size uncertainty |
Unknown | General Oilfield Services |