โ† Back to Daily Permits

๐Ÿ›ข๏ธ ALBERT SOUTH 34-33-32 3H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #42986 ยท Generated 2026-08-22 02:08

API
3305310818
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 West setback of 150' approved based on production liner cemented in lateral with a wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations - Conditions of Approval
Specific engineering solution (wet shoe with frac-out capability) used to gain regulatory approval for reduced boundary setback. This is a design-for-approval tactic.
2026-05-29 Completions / Frac
Tier 3 Waiver requested for 3-day waiting period after permit publication to allow civil construction to commence on or around 5/1/2026โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit to Waive Waiting Period
Operator is proactively seeking regulatory flexibility to meet a pre-arranged construction schedule, indicating urgency and coordinated pad development timing.
2026-05-01 Regulatory / Permitting
Tier 3 Surface use agreement affidavit executed December 15, 2025, covering four wells (1H-4H) from a single surface location off-spacing unit
๐Ÿ“„ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT
Early surface agreement secured months before permit approval, showing advanced land planning for a multi-well pad from an off-spacing surface location.
2025-12-15 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction
๐Ÿ“„ Stipulations - Construction Commencement Notification
Direct, personal point of contact mandated before construction begins, indicating heightened regulatory oversight or site-specific conditions.
Relative General Oilfield Services
Tier 3 Specific disposal vendor named for drill cuttings: IHD Solids Management, 14070 43rd Street NW Alexander, ND 58831
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS
Vendor pre-selected and specified in the drilling plan, indicating a locked-in waste management contract.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Site Preparation
Construction contracted to start on or around 2026-05-01, with waiver requested to bypass standard waiting period. Immediate mobilization needed.
Directional Drilling & MWD Services
Complex well path with precise targets (KOP, casing point, BHL) and survey requirements (100'/30'/90' intervals). Planning indicates imminent drilling post-construction.
Completion & Stimulation Services
Wet shoe design with frac-out capability specified for the production liner. Implies a specific completion methodology needing specialized equipment and expertise.
Environmental & Waste Management
Closed mud system, cuttings disposal to IHD Solids Management, and on-site filter sock container required from spud through flowback. Services needed throughout drilling and completion phases.