โ† Back to Daily Permits

๐Ÿ›ข๏ธ GINA FERRARI 13-12-1 1H-LL

Phoenix Operating LLC ยท Divide County, ND ยท File #42987 ยท Generated 2026-08-22 02:08

API
3302301817
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 1 Approval conditional on wellbore being located down north-south axis within 500' drilling corridor with 150' setback from north & south boundaries, based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Page 1, Conditions of Approval
Specific geosteering constraint tied to completion design (wet shoe) and frac-out capability, indicating engineered approach to boundary management
Unknown Directional Drilling
Tier 2 Operator will utilize wet shoe with ability to frac out the toe
๐Ÿ“„ Page after PROPOSED CASING PROGRAM
Specific completion technique disclosed, requiring specialized equipment and expertise
Unknown Completions / Frac
Tier 3 Operator acknowledges providing 21-31 days prior written notice to operators of wells in same/adjacent pool if completion intervals within 2,640 feetโฐ TIME-SENSITIVE
๐Ÿ“„ Page 7, OPERATOR ASSERTIONS
Extended notification window for offset operators suggests planned frac operations with significant reach, requiring coordination
Relative Completions / Frac
Tier 3 Phoenix must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Conditions of Approval
Pre-construction regulatory contact mandated, indicating heightened oversight or site-specific conditions
Relative General Oilfield Services
Tier 3 First perf point at approx 100' from hard line and 250' from section line
๐Ÿ“„ Page after PROPOSED CASING PROGRAM
Precise perforation placement relative to boundaries, indicating engineered approach to drainage and regulatory compliance
Unknown General Oilfield Services
Tier 3 The lease lines shown on this plan differ from certified plat; alternate line data used to meet permitting and regulatory compliance requirements
๐Ÿ“„ Page with directional plan notes
Discrepancy between survey data and certified plat, indicating potential land/legal complexity
Unknown General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Smoky Butte Environmental, LLC at specific address
๐Ÿ“„ Page after 5. DISPOSAL OF DRILL CUTTINGS
Vendor explicitly named for waste disposal, indicating locked-in contract or preferred provider
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Geosteering
Required to achieve precise north-south lateral placement within 500' corridor and 150' setbacks; complex trajectory entering Bakken outside spacing unit
Specialized Completion Services
Wet shoe installation and frac-out capability specified; precise perf placement required relative to boundaries
Regulatory & Coordination Services
Mandatory pre-construction inspector contact and 21-31 day offset operator notifications create timing dependencies
Surveying & Land Services
Discrepancy between lease lines and certified plat requires resolution; alternate data being used for compliance
Waste Management
Drill cuttings disposal pre-allocated to Smoky Butte Environmental, but other waste streams (filter socks, fluids) may need management