๐Ÿ›ข๏ธ CANDY FERRARI 24-25-36 2H

Phoenix Operating LLC ยท Divide County, ND ยท File #42988 ยท Generated 2026-08-22 02:09

API
3302301818
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, NDIC Field Order Info
Unusual setback conditions tied to specific completion design (wet shoe with frac-out capability) rather than standard regulatory setbacks
Unknown Completions / Frac
Tier 3 Affidavit of Surface Damage Agreement dated April 9, 2026 confirms surface use agreement for off-spacing wells from pad in Section 13
๐Ÿ“„ Affidavit section, end of document
Surface agreement specifically for off-spacing wells from single pad location
2026-04-09 General Oilfield Services
Tier 3 Letter dated February 5, 2026 requests Backbuild Order Waiver for five CANDY FERRARI wells entering Bakken outside target spacing unit
๐Ÿ“„ Letter to Todd Holweger, Permit Manager
Formal waiver request for drilling outside spacing unit with commitment to provide drilling/completion plans
2026-02-05 Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy section
Specific inspector named with direct contact requirement before construction begins
Relative General Oilfield Services
Tier 3 Well must be drilled in conjunction with a well that meets 1220' setback from east and west spacing unit boundaries to justify spacing unit
๐Ÿ“„ Page 2, Conditions of Approval
Drilling approval contingent on another well with specific boundary compliance
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD Services
Detailed plan exists with specific tool requirements; operator has engaged Taktikal Directional but rig is TBD
Cementing & Liner Services
Unusual requirement for production liner cemented in lateral with wet shoe and frac-out capability; specific cement designs outlined
Pad Construction & Earthwork
Detailed pad design with 82,380 cu yds earthwork; must contact inspector before construction; surface agreement secured
Waste Disposal & Environmental Services
Pre-selected disposal facility but requires closed loop system implementation and filter sock container management