โ† Back to Daily Permits

๐Ÿ›ข๏ธ CANDY FERRARI 24-25-36 4H

Phoenix Operating LLC ยท Divide County, ND ยท File #42989 ยท Generated 2026-08-22 02:09

API
3302301819
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 1 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ STIPULATIONS section, NDIC Field Order Info
Specific setback conditions tied to completion design (wet shoe) indicate regulatory focus on wellbore placement and containment, requiring precise engineering and execution
Unknown Completions / Frac
Tier 2 Operator submitted Backbuild Order Waiver request on February 5, 2026, stating wells will enter Bakken system outside target spacing unit and offset operator is Phoenix Energy (same company)
๐Ÿ“„ Letter to Todd Holweger dated February 5, 2026
Regulatory waiver sought for complex multi-well pad design crossing spacing units, with operator self-notifying as offset operator
2026-02-05 Directional Drilling
Tier 3 Affidavit of Surface Damage Agreement executed for off-spacing surface location covering multiple wells, dated April 9, 2026
๐Ÿ“„ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT section
Surface use agreement secured for pad drilling multiple wells from off-spacing location, indicating landowner negotiations completed and pad construction imminent
2026-04-09 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy section
Pre-construction contact with specific inspector is mandated, indicating heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services
Tier 3 Drill cuttings disposal explicitly contracted to Smoky Butte Environmental, LLC at specific address
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS section
Vendor pre-selected and named in permit, locking in waste disposal provider before operations begin
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad construction and earthwork
Surface damage agreement executed April 2026; detailed earthwork quantities (82,380 cu yds) and pad design completed; must contact inspector before construction
Directional drilling and MWD services
Complex trajectories crossing spacing units; detailed planning report by Taktikal Directional; specific survey requirements and anti-collision concerns addressed
Cementing and completion services
Wet shoe completion design mandated by permit; specific cement formulations and volumes detailed; ability to frac out shoe required
Waste disposal and logistics
Smoky Butte Environmental pre-selected for cuttings disposal; closed mud system required; filter sock container mandated from spud through flowback