| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Stipulations section, NDIC Field Order Info Unusual setback asymmetry tied to specific completion design (wet shoe) and ability to frac out shoe, indicating regulatory accommodation for engineered completion approach |
Unknown | Completions / Frac |
| Tier 3 |
Backbuild Order Waiver letter to NDIC states Phoenix Energy is operator of adjacent spacing unit, so no additional notification required per Order 31973 ๐ Letter from Phoenix Energy dated May 28, 2026 Operator self-notification waiver for traversing adjacent unit because they control both units, streamlining regulatory process |
2026-05-28 | Regulatory / Permitting |
| Tier 3 |
Affidavit of Surface Damage Agreement executed for off-spacing surface location covering multiple wells, dated February 12, 2026 ๐ Affidavit of Surface Damage Agreement section Surface use agreement specifically for off-spacing location executed months before permit approval, showing advanced surface rights planning |
2026-02-12 | Drilling Rigs |
| Tier 3 |
Closed mud system with no cuttings pit required; cuttings to be hauled to Smoky Butte Environmental LLC at specific address ๐ Permit Review Policy and Disposal of Drill Cuttings sections Explicit waste disposal vendor named (Smoky Butte Environmental) with closed-loop system mandate, not just generic requirement |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE ๐ Permit Review Policy section Specific inspector named with direct contact requirement before construction begins, indicating heightened regulatory oversight or site-specific concerns |
Relative | General Oilfield Services |