๐Ÿ›ข๏ธ BRYNN FERRARI 15-10-3 2H

Phoenix Operating LLC ยท Divide County, ND ยท File #42991 ยท Generated 2026-08-22 02:10

API
3302301821
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, NDIC Field Order Info
Unusual setback asymmetry tied to specific completion design (wet shoe) and ability to frac out shoe, indicating regulatory accommodation for engineered completion approach
Unknown Completions / Frac
Tier 3 Backbuild Order Waiver letter to NDIC states Phoenix Energy is operator of adjacent spacing unit, so no additional notification required per Order 31973
๐Ÿ“„ Letter from Phoenix Energy dated May 28, 2026
Operator self-notification waiver for traversing adjacent unit because they control both units, streamlining regulatory process
2026-05-28 Regulatory / Permitting
Tier 3 Affidavit of Surface Damage Agreement executed for off-spacing surface location covering multiple wells, dated February 12, 2026
๐Ÿ“„ Affidavit of Surface Damage Agreement section
Surface use agreement specifically for off-spacing location executed months before permit approval, showing advanced surface rights planning
2026-02-12 Drilling Rigs
Tier 3 Closed mud system with no cuttings pit required; cuttings to be hauled to Smoky Butte Environmental LLC at specific address
๐Ÿ“„ Permit Review Policy and Disposal of Drill Cuttings sections
Explicit waste disposal vendor named (Smoky Butte Environmental) with closed-loop system mandate, not just generic requirement
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy section
Specific inspector named with direct contact requirement before construction begins, indicating heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Detailed directional plan already created by Taktikal Directional with specific tool program; operator may be locked into this vendor or seeking similar expertise
Pad construction and earthwork
Complete engineering package exists with exact cut/fill quantities (73,270 cu yds) and timeline; construction must follow specific inspector notification protocol
Cementing and completion services
Wet shoe design with ability to frac out shoe is critical to regulatory approval; specialized cementing expertise required for production liner
Waste management and disposal
Smoky Butte Environmental explicitly named for cuttings disposal; closed-loop system required creates immediate need