๐Ÿ›ข๏ธ ALBERT SOUTH 34-33-32 1H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #43003 ยท Generated 2026-08-22 02:12

API
3305310819
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 West setback reduced to 150' based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Non-standard setback approval tied to specific completion design (wet shoe with frac-out capability)
2026-06-04 Completions / Frac
Tier 3 Operator requested waiver of 3-day waiting period to commence construction on or around 5/1/2026 due to contractual obligation with civil construction companyโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit to Waive Waiting Period
Shows urgency and pre-committed construction timeline, indicating immediate pad development activity
2026-05-01 Regulatory / Permitting
Tier 3 Surface use agreement affidavit covers 4 wells (1H-4H) from single pad location, executed 12/15/2025
๐Ÿ“„ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT
Multi-well pad development confirmed with landowner agreement already in place
2025-12-15 General Oilfield Services
Tier 3 Must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction
๐Ÿ“„ STIPULATIONS - Construction Commencement Notification
Mandatory pre-construction contact with specific inspector, not just generic notification
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to IHD Solids Management at specific Alexander, ND address
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS
Vendor explicitly named for waste disposal, not left open to bid
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad Construction & Earthmoving
Waiver request shows construction must commence around 5/1/2026; 81,720 CY of embankment work specified
Cementing & Liner Services
Wet shoe design with frac-out capability is critical to approved well design; specialized cementing required
Waste Management & Disposal
IHD Solids Management pre-selected, but other waste services (filter sock containers, fluid handling) needed
Surveying & Directional Drilling
Complex 4-well pad with precise legal coordinates; survey frequency requirements specified