| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
West setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Stipulations - Conditions of Approval Non-standard setback approval reveals specific completion design (wet shoe) and regulatory accommodation for technical approach |
2026-06-04 | Completions / Frac |
| Tier 3 |
Operator requested waiver of 3-day waiting period to commence operations on or around 5/1/2026 due to contractual obligation with civil construction companyโฐ TIME-SENSITIVE ๐ Affidavit to Waive Waiting Period Reveals urgency and pre-committed construction timeline, indicating accelerated pad development schedule |
2026-04-20 | Regulatory / Permitting |
| Tier 3 |
Surface use agreement affidavit covers four wells (1H-4H) from single pad location, acknowledging off-spacing drilling ๐ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT Multi-well pad development with off-spacing wells from single surface location, indicating coordinated development strategy |
2025-12-15 | General Oilfield Services |
| Tier 3 |
Must contact NDIC Field Inspector Will Ryan at 701-770-6684 prior to location construction ๐ Stipulations - Construction Commencement Notification Specific inspector contact requirement indicates heightened regulatory oversight or site-specific concerns |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-selected to IHD Solids Management at specific Alexander, ND address ๐ DISPOSAL OF DRILL CUTTINGS Vendor pre-selection for waste disposal indicates established supply chain relationship |
Unknown | General Oilfield Services |