| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Off-spacing well requiring affidavit for surface use agreement due to drilling from Section 30 into target spacing unit (Sections 6,7,18,19). ๐ Affidavit section, Drilling Permit Affidavit, and Surface Use Agreement description Well is drilled from outside the target spacing unit, requiring special regulatory compliance and surface owner negotiations. This indicates complex land/unit planning and potential for disputes or coordination with adjacent operator Kraken. |
2026-05-12 | General Oilfield Services |
| Tier 3 |
Mandatory anti-collision protocols with specific separation factors and real-time monitoring requirements due to dense existing wellbores. ๐ PROPOSED WORK section and Anticollision Report Hess specifies using certified well planners, real-time corrected surveys, minimum 1.5 separation factor, and increased survey frequency for collision avoidance. Anticollision report shows Level 2 and Level 3 warnings with nearby wells. |
2026-04-21 | Directional Drilling |
| Tier 3 |
Detailed engineered pad design with specific construction specifications and 40.37 acres total disturbance. ๐ Civil engineering plans and quantity estimates Pad design includes cement stabilization, specific compaction requirements, stormwater release structures, and detailed reclamation plans. Much more detailed than typical pad specs. |
2025-10-03 | General Oilfield Services |
| Tier 3 |
Cemented liner with wet shoe design allowing intentional over-displacement and ability to 'frac out the shoe' for first stage. ๐ Completion Equipment section and Drilling Program Non-standard completion design using wet shoe sub with rupture pins and plug chamber for visible bump. First stage pumped out the shoe, subsequent stages use plug and perf. |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit requirement combined with cuttings hauling to state-approved facility. ๐ STIPULATIONS and Drilling Program notes Eliminates traditional cuttings pit, requiring closed-loop system and offsite disposal. Note mentions existing reclaimed cuttings pit materials must be hauled away. |
Unknown | Mud / Fluids |
| Tier 3 |
Explicit requirement to contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE ๐ STIPULATIONS section Named individual inspector with direct contact requirement indicates heightened regulatory oversight or site-specific concerns. |
Relative | General Oilfield Services |