๐Ÿ›ข๏ธ BW-Braaten-149-100-1906H-2

Hess Bakken Investments II, LLC ยท McKenzie County, ND ยท File #43006 ยท Generated 2026-08-22 02:14

API
3305310822
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Cemented liner with wet shoe design to intentionally frac out the shoe
๐Ÿ“„ Drilling Prognosis section, Completion Equipment details
Specific engineered completion design choice (wet shoe with rupture pins) to enable shoe fracturing. Deviates from standard liner cementation.
Unknown Completions / Frac
Tier 3 Mandatory closed mud system with no cuttings pit - regulatory stipulation
๐Ÿ“„ Page 2 of 10, Stipulations section
Non-standard waste management requirement that eliminates traditional cuttings pit, forcing alternative handling (hauling to approved facility). This dictates specific waste logistics and vendor selection.
2026-06-05 Mud / Fluids
Tier 3 Waiver requested for open hole logs (Acoustic/Sonic, Density/Porosity, etc.)
๐Ÿ“„ Page 4 of 10, Proposed Logs section
Operator is seeking regulatory approval to forego standard open hole logging suite, indicating reliance on alternative data (e.g., mud logs, offsets) or cost-saving intent.
2026-06-05 Mud / Fluids
Tier 3 Affidavit provided to adjacent operator (Kraken Operating LLC) with detailed drilling plans
๐Ÿ“„ Drilling Permit Affidavit section, letter dated 2026-04-30
Formal, time-stamped notification to competitor Kraken regarding wellbore entry into their unit. Reveals regulatory compliance for off-spacing wells and inter-operator coordination.
2026-04-30 General Oilfield Services
Tier 3 Mandatory contact with NDIC Field Inspector Will Ryan prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, Stipulations section
Personalized regulatory oversight requirement with a named inspector. Indicates heightened scrutiny or site-specific sensitivities.
Relative General Oilfield Services
Tier 3 Anti-collision protocol requiring surveys every 93'-100', increasing frequency as needed
๐Ÿ“„ Page 7 of 10, Proposed Work section
Enhanced survey frequency beyond standard rules (100' vertical, 90' lateral) due to dense wellbore environment. Demonstrates proactive risk mitigation in a crowded field.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Closed-Loop Drilling & Cuttings Hauling/Disposal
Regulatory stipulation mandates 'closed mud system with no cuttings pit'. Cuttings must be hauled to approved facility. Immediate need for specialized fluid handling and waste transportation services upon spud.
Directional Surveying & MWD Services
Anti-collision protocols require surveys every 93'-100' with increased frequency as needed. High-density wellbore environment demands continuous, precise surveying from spud through lateral.
Pad Construction & Civil Earthwork
Detailed engineered pad design by KLJ is approved. Construction must commence after permit publication and requires contact with NDIC inspector Will Ryan. Large quantities of excavation, embankment, and surfacing specified (e.g., 65,726 CY embankment).
Cementing Services (Liner)
Specific cemented liner design with wet shoe and intentional over-displacement for frac-out. Requires precise slurry design and execution to achieve engineered outcome.