| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback reduced to 150' (vs. standard 500') based on production liner cemented in lateral with a wet shoe and ability to frac out the shoe. ๐ Permit Stipulations, Page 2. Non-standard setback granted due to specific completion design (cemented liner with wet shoe). This is a regulatory variance based on engineered solution. |
Unknown | Completions / Frac |
| Tier 3 |
Off-spacing well requiring affidavit of executed surface use agreement for drilling into Sections 6,7,18,19 from pad in Section 30. ๐ Affidavit section, Drilling Permit Affidavit, and Surface Use Agreement description. Well is drilled from outside its target spacing unit (Sections 6,7,18,19) from a pad in Section 30, requiring a specific, executed surface use agreement with landowner Craig Braaten. This indicates a complex land/unit access strategy and potential for similar off-spacing development from single pads. |
2026-05-12 | General Oilfield Services |
| Tier 3 |
Affidavit provided to adjacent unit operator (Kraken Operating LLC) detailing directional plan, casing design, and spud date, as required by Order No. 31973. ๐ Drilling Permit Affidavit and cover letter to Kraken. Demonstrates formal, time-sensitive regulatory compliance for drilling through an adjacent operator's unit. Includes sharing of proprietary drilling/completion plans. |
2026-04-30 | Directional Drilling |
| Tier 3 |
Extensive, engineered pad and access road construction plan with detailed quantities, specifications, and reclamation requirements (40.37 acres disturbance). ๐ Civil engineering plans (KLJ drawings), Basis of Estimate, Plan Notes. The level of detail (grading, culverts, seeding mixes, stormwater release structures) exceeds routine permit data. Shows significant pre-investment in pad infrastructure for a 4-well pad. |
2025-10-03 | General Oilfield Services |
| Tier 3 |
Waiver requested for open hole logs (Acoustic/Sonic, Density/Porosity, Resistivity) per attached log waiver. ๐ Proposed Logs section, Page 4. Operator is seeking to forego standard open hole data acquisition, indicating reliance on other data (e.g., offset wells, cased hole logs, geosteering) or cost-saving intent. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Stipulations, Page 2. Explicit, named inspector contact is a condition of approval, not a generic requirement. Indicates heightened regulatory oversight or site-specific concerns for this pad. |
Relative | General Oilfield Services |