| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Strict regulatory condition: North setback approval based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. ๐ Permit Stipulations (Page 2) This is a specific, non-standard engineering condition tied to the 150' north setback. It dictates a particular completion design (cemented liner with wet shoe) and implies regulatory scrutiny or unique geomechanical constraints near the boundary. |
2026-06-05 | Completions / Frac |
| Tier 3 |
Operator asserts use of anti-collision guidance from certified well planners, real-time corrected surveys, and a minimum 1.5 separation factor standard, with exceptions managed by risk assessments and Management of Change (MOC). ๐ Proposed Work / Anti-collision (Page 7) Reveals Hess's formalized, high-standard anti-collision protocol exceeding basic regulatory requirements. Mentions specific processes (MOC) for handling exceptions. |
2026-06-05 | Directional Drilling |
| Tier 3 |
Off-spacing well requiring affidavit for surface use agreement with adjacent unit operator (Kraken Operating LLC) due to wellbore traversing their spacing unit (Sections 30,31 T149N-R100W) to target unit (Sections 6,7,18,19 T149N-R100W). ๐ Drilling Permit Affidavit, Affidavit, and related correspondence Reveals complex unit boundary crossing requiring pre-drill coordination and legal agreements with competitor operator (Kraken). Indicates strategic development across unit lines, not just within a single unit. |
2026-04-30 | Directional Drilling |
| Tier 3 |
Core and sample submission deadlines: cuttings within 30 days, any cores within 180 days of completion of drilling operations.โฐ TIME-SENSITIVE ๐ Cores and Samples Letter (Page 1) Creates firm, calendar-driven obligations post-drilling. Failure incurs daily civil penalties up to $12,500. |
Relative | General Oilfield Services |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Stipulations (Page 2) Explicitly names the specific field inspector and requires contact before dirt work begins. This is a gate for construction mobilization. |
Relative | General Oilfield Services |