| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Production liner cemented in lateral with wet shoe and no ability to frac out the shoe ๐ STIPULATIONS section, Wellbore Schematic note Unusual completion design constraint affects stimulation operations |
Unknown | Completions / Frac |
| Tier 3 |
Drillback order 31848 requires notification to adjacent spacing unit operator (Morningstar Operating LLC) with detailed drilling/completion plans before operations commenceโฐ TIME-SENSITIVE ๐ Affidavit Affirming Notification to Adjacent Spacing Unit - Drillback Order 31848 Regulatory requirement for cross-unit drilling creates pre-drilling coordination obligation with competitor |
Relative | General Oilfield Services |
| Tier 3 |
Must contact NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Construction Commencement Notification Specific inspector named with direct contact requirement before pad construction |
Relative | General Oilfield Services |
| Tier 3 |
Impermeable liner may be required at discretion of NDIC Field Inspector due to QGIS sensitive geology layer ๐ STIPULATIONS section Discretionary environmental requirement tied to GIS data layer |
Unknown | General Oilfield Services |
| Tier 3 |
Proposed to drill 3 Bakken horizontal wells and one future SWD well on this pad ๐ PROPOSED WORK section Multi-well pad with planned SWD indicates longer-term development strategy |
Unknown | General Oilfield Services |